An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coal in Botswana: Power, Fuel and Export Warren Newfield CEO & Co-Chairman September 10, 2008

  2. Forward Looking Statement This presentation contains certain “forward-looking statements”. All statements, other than statements of historical fact, that address activities, events or developments that CIC Energy Corp. (“CIC” or the “Company”) believes, expects or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements reflect the current internal projections, expectations or beliefs of CIC based on information currently available to CIC. Such forward-looking statements include, among other things, statements relating to the reconfigured first phase (“Phase One”) of the Mmamabula Energy Project (the “MEP”), the coal-to-hydrocarbons (“CTH”) Project and the Export Coal Project with respect to estimates and/or assumptions in respect of mineral resources, mineral resource qualities, targets, future production, goals, scheduling, objectives, plans and future economic, market and other conditions. Forward-looking statements are subject to significant risks and uncertainties and other factors that could cause actual results to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on CIC. Factors that could cause actual results or events to differ materially from current expectations include, but are not limited to: the failure of the Company to successfully design a viable reconfigured Phase One of the MEP, to complete a positive bankable feasibility study thereon and/or to negotiate and enter into a power purchase agreement with Eskom Holdings Limited (“Eskom”) and/or Botswana Power Corporation (“BPC”) and an EPC contract in respect thereof on terms acceptable to the Company and project lenders; volatility of and sensitivity to market prices for coal and prices (market or otherwise) for electricity; changes in anticipated demand for power in southern Africa; changes in equity markets; capital and operating costs varying significantly from estimates; environmental and safety risks, including increased regulatory burdens; failure to complete, or delays in completion of, positive feasibility and value chain studies on the CTH Project; failure to complete a positive pre-feasibility study on the transportation options concerning the Export Coal Project; failure to obtain a viable transportation solution to export coal and/or failure to enter into export coal purchase agreements; the grade, quality and recovery of coal which is mined varying from estimates (the mineral resource figures referred to in this presentation are estimates and no assurances can be given that the indicated levels of coal will be produced); inflation; changes in exchange rates; delays in the development of the reconfigured Phase One of the MEP, the CTH Project and/or the Export Coal Project caused by unavailability of equipment (or equipment failure), labour or supplies or limited capacity among EPC contractors (and resulting less attractive EPC contract terms being made available) or by climatic conditions, seismic activity, other natural phenomena or otherwise; risks relating to labour; unexpected geological or hydrological conditions; insufficient transportation and transmission capacity; geological and mechanical conditions; delays or failures in obtaining regulatory permits and/or licences (and renewals thereof) respecting mining, power generation and/or power transmission lines; the existence of undetected or unregistered interests or claims, whether in contract or tort, over the properties of CIC; availability of water and sorbent at cost effective prices; the failure of the Company to enter into transmission and other agreements required to facilitate the development, operation and financing of the reconfigured Phase One of the MEP, including with the Government of Botswana on favourable terms or at all; failure to raise additional funds (by way of debt and/or equity) on favourable terms to finance such development; inability to obtain requisite credit support from the Government of Botswana and/or the Government of South Africa; failure to enter into technology, intellectual property licensing and other agreements required to develop the CTH Project; changes in government regulations and policies, including tax and trade laws and policies; political risks arising from operating in Africa; lack of markets for the Company’s coal resources; or other factors (including development and operating risks). Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, CIC disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although CIC believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. Mineral resource figures included in this presentation are estimates and no assurances can be given that the indicated levels of coal will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While CIC believes that the mineral resource estimates included in this presentation are well established, by their nature resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. The extent to which mineral resources may ultimately be reclassified as proven or probable reserves is dependent upon the demonstration of their profitable recovery. The evaluation of mineral reserves or resources is always influenced by economic and technological factors, which may change over time. No assurances can be given that any mineral resource estimate will ultimately be reclassified as proven or probable reserves. If CIC Energy’s mineral resource estimates for its coal properties are inaccurate or are reduced in the future, this could have a material adverse impact on CIC. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Measured and indicated resources are sufficiently well defined to allow geological and grade continuity to be reasonably assumed and permit the application of technical and economic parameters in assessing the economic viability of the resource. Inferred resources are estimated on limited information not sufficient to verify geological and grade continuity or to allow technical and economic parameters to be applied. Inferred resources are too speculative geologically to have economic considerations applied to them to enable them to be categorized as mineral reserves as there is no certainty that mineral resources can be upgraded to mineral reserves through continued exploration.

  3. Tau Capital Corp. www.taucapital.com Tau Capital Corp. is a resource finance & services company with a strong track record in advising on the exploration and development of major projects in the resource and energy sectors. The Tau Group of Companies includes: CIC Energy Corp. TSX: ELC, BSE:CIC ENERGY Development of the Mmamabula coal resource for power generation, thermal coal exports and coal-to-hydrocarbons facility Talon Metals Corp. (Formerly BrazMin Corp.) TSX:TLOPrecious and Base Metal Exploration Saber Energy Corp. (Private)Proposed Development of Gas Field and Power Station, Southern Africa In 2007 closed private placement of US$45M AfriOre Limited Sold to Lonmin plc in January 2007 for approximately C$500 million Platexco Inc. Sold to Impala Platinum (Implats) in 2000 for C$191 million

  4. Mmamabula Energy Complex • CIC Energy Corp. commenced trading on the Toronto Stock Exchange in March 2006 and on the Botswana Stock Exchange in June 2006 • The Company’s focus is the Mmamabula Energy Complex, which is located in southeastern Botswana Mmamabula Energy Project (phased development) • Power station and integrated coal mine • 2012/13 Commercial Operations Coal-To-Hydrocarbons (CTH) Project • Coal gasification to produce • fuels and chemicals • 2014 Commercial Operations • Mine, beneficiate and rail export coal • to a port in Southern Africa • 2014 Commercial Operations Export Coal Project

  5. Botswana: An Economic Success Story • Political & Financial Stability • Stable multi-party democracy • GDP per capita of $US 5,580 • Average GDP growth of 5% (2000 -2006) • Significant foreign currency reserves • Favorable foreign investment climate • No exchange controls • Low tax rate • A2 Credit rating by Moody's • Australian Publication “Resource Stocks”: • Rated Botswana as having the 7th lowest country risk for mining globally (2007) • Transparency International: • Rates Botswana as having one of the lowest corruption indexes in the world, 37th out of 165 countries (2006) • Strong support by Government of Botswana (“GoB”) for development of Mmamabula coal resource, including meaningful fiscal incentives Tunisia Marocco Algeria Sahara Libya Egypt Mauritania Mali Niger Eritrea Senegal Chad Djibouti Sudan Burkina Faso Guinea Benin Nigeria Ghana Ethiopia Sierra Leone Ivory Coast Central African Rep. Liberia Somalia Cameroon Togo Uganda Equit. Guinea Kenya Congo Sao Tome & Principe Gabon R. DRC B. Tanzania Political and Economic Risk Comores Malawi Angola Mozambique Zambia Low Medium-low Medium Medium-high High Zimbabwe Madagascar Botswana Mauritius Namibia Swaziland South Africa Lesotho Source: Aon Group, Inc 2007

  6. Mmamabula Energy Complex Location • The Project is located in Botswana’s Mmamabula Coal Field - the extension of South Africa’s Waterberg Coal Field • Waterberg contains in excess of 40% of South Africa’s coal reserves • Waterberg is host to Exxaro’s 19 Mtpa Grootegeluk coal mine and Eskom’s 3,690 MW (gross) Matimba power station • Waterberg is also host to Eskom’s recently approved approximately 4,800 MW (gross) Medupi power station currently under construction • Ideal location with proximity to South African power grid • Easy access to Botswana’s A1 highway, rail, power and water infrastructure

  7. Significant baseload power generation capacity is required in Southern Africa to sustain GDP growth and to support energy-intensive private investment Oil prices are soaring, while a petroleum refining shortfall is looming in South and Southern Africa – coal to hydrocarbons becomes an attractive option Coal prices are increasing rapidly, both globally and in South Africa - strong incentive to export coal from the Mmamabula Coal Field Current coal prices (FOB Richards Bay), approx. US$150 per ton for delivery Q3/2008 and US$160 per ton for Q1/2009) Mmamabula Business Case South Africa Power Demand Scenarios (Source: Eskom)

  8. South Africa Power System - Demand & Supply Existing and New Capacity assuming 15% System Reserve Margin 100,000 95,000 90,000 85,000 80,000 75,000 70,000 65,000 60,000 55,000 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 2027 2028 2029 2025 South Africa Demand and Supply Balance MW New Eskom capacity includes: Return to service of 3 old coal stations: 3,471 MW (net) 2 x new coal stations (Medupi + Kuslie): 8,766 MW (net) 2 x OCGT plant (liquid fuel fired): 2,065 (net) Upgrade of one old coal station: 300 MW (net) 1 x pumped storage plant: 1,382 MW (net) 1 x wind power plant: 100 MW (net) (4.5%) 2030 Existing plant (2007) + Cahora Bassa New Eskom capacity (16,100 MW total) Demand (incl. export) @4% p.a.

  9. South African Power Deficit South African Power Deficit @ 15% Reserve Margin - after Eskom Capacity Expansion MW 16,000 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Deficit after New Eskom Projects (15% Reserve Margin)

  10. Mmamabula Overview • Mmamabula previously explored by BP’s Coal Division, with a focus on coal exports at a time when Southern Africa had excess electrical generating capacity • The Company commenced an extensive exploration program at Mmamabula in 2005 – to date CIC Energy has drilled in excess of 174,000 metres in over 1,945 holes • Resources total approximately 3 billion tonnes(NI 43-101 measured and indicated)1 as of August 2008 and coal qualities indicate good power station feed, with raw calorific values (“CV”) of approximately 21 to 23 MJ/kg • Exploration drilling program completed • Sufficient coal resource for • Mmamabula Energy Project power station • Coal-to-Hydrocarbons (“CTH”) Project • Export Coal Project 1 Please see the technical reference on slide 18 of this presentation

  11. Mmamabula East and South NI 43-101 Mineral Resource Estimates announced August 2008

  12. MEP - Accomplishments • Key Memoranda of Understanding (“MoU”) signed: CIC-Eskom MoU, Inter-Governmental MoU, CIC-Government of Botswana MoU, Inter-Utility MoU • Completion of exploration drilling, development of geological models and completion of mine planning for the Mmamabula Coal Field • Good working relationship with Eskom and BPC and through mutual understanding on project structure and commercial terms and conditions • Good progress on independent power producer (“IPP”) and mining licenses • Environmental Impact Assessments on Mine, Power Plant and Transmission submitted to GoB • Electricity Supply Act and Mines and Minerals Act amendments to cater for MEP passed into law • Environmental approvals for new transmission infrastructure in South Africa • Positive interest from international and local financial markets

  13. MEP - Milestones to be Achieved • Select Engineering, Procurement & Construction (“EPC”) contractor and negotiate an EPC contract – anticipated prior to year end • Power Purchase Agreement with Eskom and/or BPC • Implementation Agreement with Government of Botswana • Issuance of Power Generation and Coal Mining Licenses • Complete Bankable Feasibility Study • Financial Close • Start of Construction • Commercial Operations

  14. Coal-to-Hydrocarbons Project • Large scale coal gasification and petrochemicals plant at Mmamabula • Produce fuels and petrochemicals • Option on coal gasification technology has been secured with Shell • Feasibility studies completed • Jacobs Engineering – gasification technology selection, methanol plant and manufacture of fuels • Toyo Engineering – manufacture of fuels and/or fuel substitutes • Lategan & Bouer and VGI - multi-product pipeline to South Africa • Wood Mackenzie initial market study completed • 2nd phase detailed value-chain study underway by Shell Global Solutions International (Complete in Q3 2008) • Commercial operations envisaged in 2014

  15. Export Coal Project • Exporting of seaborne traded A grade thermal coal from the Mmamabula Coal Field • Current coal prices are approx. $150/tonne FOB Richards Bay, South Africa • A pre-feasibility study on the rail and port options (Complete in Q3 2008) • Preferred rail route is west to a port in Namibia • An approximately 1,500 kilometer Trans Kalahari rail line would have to be constructed by a transportation consortium, which could include CIC Energy • CIC Energy would be one of the “anchor” offtakers for this new rail line • Commercial operations are envisaged for 2014

  16. Cash (as at September 2008)C$100 M Shares issued 53.7 M Shares fully diluted 61.0 M Share Price (as at September 8, 2008 )C$ 3.62 52 week high C$18.15 Market Capitalization C$ 200 M Financial Information TSX:ELC BSE:CIC ENERGY

  17. Thank You TSX:ELC BSE:CIC ENERGY Erica Belling VP Investor Relations (416) 361-9636 ext. 243 ebelling@taucapital.com

  18. Appendices 1Additional information with respect to Mmamabula is contained in a news release of August 14, 2008 a copy of which has been filed on SEDAR and may be accessed at www.sedar.com. Ms. Lesley Jeffrey is the “Qualified Person” for Mmamabula within the meaning of NI 43-101. Ms. Jeffrey is employed by Bon-Terra, a subsidiary of CIC Energy.

  19. Feasibility studies are being completed on the Mmamabula Energy Project, Coal-to- Hydrocarbons Project and Export Coal Project and total investment is more than US$100 million. Companies conducting various studies include: Snowden – NI 43-101 compliant resource estimates Bon-TerraMining* – Resource modeling & mine planning Environmental Resources Managers and Digby Wells and Associates for Groundwater and Environmental Studies, and Gibb Africa for Surface Water Studies Dowding, Reynard and Associates (Pty) Limited (“DRA”) – Mine beneficiation plant designs Africon – Design of common infrastructure Clifford Chance – Project Legal Counsel (International) Edward Nathan Sonnenberg (Local) Lenders Legal Counsel, International: Shearman & Sterling,Local: Webber Wentzel Bowens Jacobs Engineering, Toyo Engineering, Lategan & Bouer and VGI – Coal-to-Hydrocarbons Project MRN Runge, DRA and Africon – Export coal mine design, beneficiation plants and rail and port designs Mmamabula Energy Complex Feasibility Studies * Bon-Terra Mining (Pty) Ltd. is a subsidiary of CIC Energy Corp.

  20. Financing the MEP • CIC Energy to contribute its pro-rated share of equity funding • Project financing anticipated 80% debt – 20% equity • Expected sources of equity funding for CIC Energy • Credit for related historic expenses • Developers fee (% of project cost) • Equity premium (ROE)

  21. Warren Newfield, Chief Executive Officer andCo-Chairman Gregory Kinross, President Tore Horvei, Chief Operations Officer (Projects) Edward Scholtz, Chief Operations Officer (Mining) Craig McLeary, Chief Financial Officer CIC Energy SA (Pty) Ltd Gibbs Johnson, General Counsel Jennifer Feinberg, Executive Vice President, Project Finance Anton Reiche, Executive Vice President, Project Implementation Pieter du Toit, Executive Vice President, Coal-to-Hydrocarbons Mike Page, Executive Vice President, Projects Dale Ter Haar, Head, Botswana Office Executive Management Team and Key Advisors CIC Energy has assembled a highly experienced mining & power station management & technical team • Lead Advisors • Jan de Beer, Project Manager- Power Plant BFS • former CEO of Eskom Enterprises • Arnot Hepburn,Transmission & Integration • former Head of Transmission Planning for Eskom • John Farr,Wellfield Consulting Services • Louis Grobler, Project Manager – CTH, • former Director of C & L Developments (PTY) Ltd. • Mining Team • Jock Nel, Operations Director • Ronnie van Eeden, Commercial & Legal Director • Dr. Nielen van der Merwe, Technical Director • Mac van der Merwe, Coal ExportProject Manager: • Rail and Port • Mike Dunn, Port Consultant

  22. Warren Newfield, Co-Chairman (Canada) Chief Executive Officer, CIC Energy Corp. Reuel Khoza, Co-Chairman (South Africa) Chairman, Nedbank; Former Chairman, Eskom Gregory Kinross(South Africa) President, CIC Energy Corp. Blackie Marole(Botswana) Managing Director, Debswana Mandla Gantsho(South Africa) Vice President Operations, African Development Bank Len Konar(South Africa) Director, South African Reserve Bank Sandra Cowan(Canada) Partner and General Counsel, Edgestone Capital Partners E. Adrian Meyer(Barbados) Principal & Director, Cidel Bank & Trust Board of Directors

  23. MAMMABULA STRATIGRAPHY THICKNESS LITHOLOGY SEAM (m) Unconsolidated Sand RECENT 5.0 Grey Brown Mudstone 15.0 Carbonaceous Mudstone 9.0 and thin Coal Bands Sandstone 8.0 UPPER ECCA Carbonaceous Mudstone and thin Coal Bands 17.0 Sandstone 7.0 Carbonaceous Mudstone and thin Coal Bands 11.0 COAL D1 Seam 6.0 Sandstone - M3 Coal Seam 20.0 COAL 3.0 M2 Seam Sandstone 6.0 Siltstone with interbedded sandstone 20.0 COAL 1.0 LOWER ECCA Siltstone 10.0 Siltstone with interbedded sandstone 25.0 Siltstone and Mudstone 50.0 Sandstone DWYKA 26.0 Pre Karoo Quartzite Stratigraphic Column – Mmamabula East • Two seams of interest: • D1 Seam: • approximate thickness:6m • Depth: approximately 72m • Competent floor • 1m coal left in roof for additional • roof support • M2 Seam: • approximate thickness: 3m • Depth: approximately 98m • Competent roof and floor

  24. Mookane Block, Mmamabula East M2 and D1 Raw Coal Qualities (source: Bon-Terra) Note: * The level of sulphur emissions is currently planned to be reduced to below World Bank standards using partial washing in the mine and Flue Gas Desulphurisation (FGD) in the power plant

  25. Dovedale Block, Mmamabula East M2 and D1 Raw Coal Qualities (source: Bon-Terra) Note: * The level of sulphur emissions is currently planned to be reduced to below World Bank standards using partial washing in the mine and FGD in the power plant

  26. Serorome Block, Mmamabula East M2 and D1 Raw Coal Qualities (source: Bon-Terra) Note: * The level of sulphur emissions is currently planned to be reduced to below World Bank standards using partial washing in the mine and FGD in the power plant

  27. Border Block, Mmamabula East M2 and D1 Raw Coal Qualities (source: Bon-Terra) Note: * The level of sulphur emissions is currently planned to be reduced to below World Bank standards using partial washing in the mine and FGD in the power plant

  28. Coal-to-Hydrocarbons Project Gasification Island Electricity Coal Steam/Heat DME/Fuels Syngas Methanol Petrochemicals Synthetic NG Town Gas FT Liquid Fuels Oil Refineries Hydrogen Ammonia Urea Gasified coal produces synthesis gas (syngas) which can then be converted to a variety of downstream products, including fuels and petrochemicals. Shift Saline Acquifers Storage Carbon Dioxide

  29. Export Coal Project Rail and Port Conceptual Study: West Coast Routes Walvis Bay port location Namibia Botswana Lunderitz port location

  30. Transmission Solution • Solutions created • in partnership with • Eskom and BPC • Tight integration with • Eskom and BPC • networks in South • Africa and Botswana • Long-term solutions • catering for future • expansion

  31. Botswana Water Sources Dikgatlhong Dam (62 Mm3)* Shashe Dam (23 Mm3) Dikgatlhong Pipeline (75 km)* Letsibogo Dam (24 Mm3) Selebi Phikwe Thuni Dam (5 Mm3)* NSC2 Pipeline (345 km)** Lotsane Dam (6 Mm3)* NSC1 Pipeline (360 km) Palla Road Wellfield (2.5 Mm3) Maiphafela Wellfield (6Mm³/a) Kudumatse Area Mmamabula Energy Project Bonwapitse Wellfield (6-10.6 Mm³/a) * Planning / Development Masama Wellfield (10 Mm3)* ** Proposed Gaborone