1 / 4

WiMax Status @ UCLA

WiMax Status @ UCLA. Giovanni Pau UCLA gpau@cs.ucla.edu. Status. Connection to Mesoscale Infrastructure Openflow switches are purchased and delivered Backbone side Open Switch is Installed but yet to be confirgured

dyanne
Download Presentation

WiMax Status @ UCLA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WiMax Status @ UCLA Giovanni Pau UCLA gpau@cs.ucla.edu

  2. Status • Connection to Mesoscale Infrastructure • Openflow switches are purchased and delivered • Backbone side Open Switch is Installed but yet to be confirgured • BTS side there is a missing 20-25meters of fiber that need to be run cross floors, work order has been submitted on-hold for Facility Management to Proceed. • Installation of the Airspan BST • Location selected (Top o Spraul Hall) • Pole Installed • On Hold for • Power Supply • Network (we may go wireless on that) • FCC Related • Renewed Experimental License • Coordination with Clear Started GTTI Cagliari

  3. Deployment Airspan BS will be on a 17 storey buildings which is built on a 150m hill. GTTI Cagliari

  4. Envisioned Timeline • Connection to MesoscaleInfrastrucutre • 3-4 weeks depending on the Facility management • Preliminary setup of the VLAN (backbone side) could start in about 1.5 weeks. • Airspan Installation • About 4 additional Weeks • 2 Weeks to Power • 2 Weeks for Installation • Delays may come if Facility des not bring Power. • Experiments • Planning multiple-path network-coded tcp experiments with MIT • Once Connected to ION we will be able to run Nation Wide experiments. GTTI Cagliari