An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Endcap AlignmentSoftware & CalibrationFebruary 2006 Samir Guragain, Marcus Hohlmann Florida Tech USCMS EMU meeting – Florida Institute of Technology, Feb 17/18, 2006

  2. ME Alignment System Transfer plate Z-sensors Clinometers Note: only small sample of analog sensors shown R-sensors DCOPS This figure featured in Physics TDR – Vol.1 M. Hohlmann - EMU meeting at Florida Institute of Technology

  3. Overview • Analog sensor calibration • Offline Alignment Software status • Input services for COCOA alignment fits • Magnet Test & Cosmic Challenge • Report from CMS Software Readiness Review during recent CPT week • Manpower Planning M. Hohlmann - EMU meeting at Florida Institute of Technology

  4. Calibration Update • Calibration bench down for several weeks due to • repeated problems with DAQ PC • Resumed calibrations end of January • All ME+ sensors to be used in Magnet Test & Cosmic • Challenge were calibrated & shipped to FNAL • Plan to finish all calibrations this month & ship M. Hohlmann - EMU meeting at Florida Institute of Technology

  5. Calibration Progress M. Hohlmann - EMU meeting at Florida Institute of Technology

  6. CSC data Optical & analog sensor rawdata Geometry of Alignment system COCOA IN COCOA: Alignment fits (now in CMSSW framework) COCOA OUT Offline reco Muon Trigger HLT, L1 POOL-ORA object (directly or via ascii) POOL-ORA object (Excel to ascii toPOOL-ORA) Event data wrapped in Root-tuple XML files POOL-ORA object Optical & analog sensor calibration data Alignment OfflineData Structure & Flow As of Feb 2006 CSC “Alignment object” contains chamber offsets …Δxi Δyi Δzi Δαi Δβi Δγi... Magnet-off Photogrammetry & Survey data MUON TRACKS M. Hohlmann - EMU meeting at Florida Institute of Technology

  7. Optical & analog sensor rawdata COCOA IN COCOA: Alignment fits (now in CMSSW framework) Event data wrapped in Root-tuple Update: Raw Sensor Data • Should be: • Voltages for analog sensors • Means and widths of Gaussian fits • for DCOPS • => Plan: Follow the lead of • Barrel Alignment Group • MB will help ME with programming: • ME needs to specify raw data • (Jim, Dave, Marcus) • MB will provide ‘root wrapper’ M. Hohlmann - EMU meeting at Florida Institute of Technology

  8. Proposed format of Barrel Alignment raw data for MTCC From Noemi Beni, student at Kossuth Lajos U., Debrecen (Feb 9. 06): 1 ROOT file for 1 set of measurement (measurement cycle) Char, goes to the end of the branch 3 Branches: Integer (0=Outer, 1=Inner side) branch 1: measID,remark,start,end Camera CMS coords (MABgap/MABsect/side/station,..) branch 2: measID,<…..><…..>X,Y,sX,sY,ROImaxX,…,ROIminY,MAXADC,current,NBACQ,threshold,err,time LED CMS coords (W/Sect/station/corner/LED,..) Integer (Error types 0, 1, 2, …) branch 3: <….>,T,RH,time T/RH sensor CMS coords (MABgap/MABsect/side/station,..) Integer (0=Outer, 1=Inner side) M. Hohlmann - EMU meeting at Florida Institute of Technology

  9. Geometry of Alignment system COCOA IN COCOA: Alignment fits (now in CMSSW framework) XML files Update: Geometry • DONE: • new COCOA version now in CMSSW; part of regular CMSSW releases (Pedro Arce) • automatically converts old ascii geometry to new XML geometry files (Pedro) • started testing this mechanism (MH) • TO DO: • define full ME alignment geometry in XML files (MH, Pedro Arce, Mike Case) • test reading XML geometry into COCOA • visualize alignment geometry in IGUANA; first attempt showed problems (MH, Mike) • verify COCOA geometry against technical detector drawings M. Hohlmann - EMU meeting at Florida Institute of Technology

  10. COCOA with DCOPS & Analog COCOA: One SLM (old style 3D visualization using VRMLview) Z-sensor and Z-target on transfer plate DCOPS SLM center R-post (“distancetarget” object in COCOA) on outer chamber ME2-2 R-sensor (“distancemeter” object in COCOA) on inner chamber ME2-1 R-sensor (“distancemeter” object in COCOA) on outer chamber ME2-2 ME 2 M. Hohlmann - EMU meeting at Florida Institute of Technology

  11. COCOA IN COCOA: Alignment fits (now in CMSSW framework) POOL-ORA object (Excel to ascii toPOOL-ORA) Optical & analog sensor calibration data Update: Sensor Calibration Data • DONE: • defined scope of calibration data to be stored for 5 types of analog sensors (MH, Samir Guragain) • devised MS Excel → ascii → POOL-ORA chain to create permanent POOL-ORA calibration objects in DB based on Fl. Tech calibration data (MH, Zhen Xie, Mike Case) • DOING: • filling analog POOL-ORA objects (SG) • TO DO: • repeat exercise for DCOPS (Dave, MH) • read POOL-ORA into COCOA M. Hohlmann - EMU meeting at Florida Institute of Technology

  12. COCOA IN COCOA: Alignment fits (now in CMSSW framework) POOL-ORA object (directly or via ascii) Surveys ? Magnet-off Photogrammetry & Survey data M. Hohlmann - EMU meeting at Florida Institute of Technology

  13. Recent Software ReadinessSelf-Review during CPT week M. Hohlmann - EMU meeting at Florida Institute of Technology

  14. Readiness Review cont’d • A few general comments: • In general, the ME al. group is quite short on manpower due to needs for commissioning the hardware • M&O funding for FY06 will presumably not arrive at institutions, e.g. Fl. Tech, before March 06 M. Hohlmann - EMU meeting at Florida Institute of Technology

  15. Summary Readiness for MTCC – slide by Oliver Buchmuller SW & Framework development - “tight” but OK Most important: Need to close the loop with Sub-detector community Faster Feedback - start testing! SW & DB Barrel/Link - “tight” Most important: Need to pick up developed SW, start testing, people involved have hardware & SW responsibilities SW & DB EndCap - on (very) critical path for MTCC Most important: We (CMS) need to find a way to support the activity ASAP - How? M. Hohlmann - EMU meeting at Florida Institute of Technology

  16. Team for Magnet test & Cosmic Challenge • Onsite at CERN: • Vladimir Sknar (PNPI) → full-time for 3 mos. • Samir Guragain (Fl. Tech) → full-time for ~4 mos. • applying for visas now • exact arrival at CERN unclear because M&O funds are very slow in coming from FNAL… (hoping for early to mid-March) • Valeri Sytnik (Riverside) → “best effort” on Analog R/O • Dave Eartly (FNAL) → brief periods • Jim Bellinger (Wisconsin) → brief period for DCOPS R/O • Offsite: • Fl. Tech (MH, half-time grad student, s/w consultant) • FNAL, Wisconsin, … M. Hohlmann - EMU meeting at Florida Institute of Technology