An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Apophis Mitigation Technology Project Organization and Reporting

  2. Bus design Materials Structure Loads analysis Mechanisms Mass tracking Size thermal sys. Size power sys. Batteries Solar cells Mission design Trajectory design Guidance Nav Attitude control Communications Tracking Uplink Downlink Data processing * System Engineering Team = Henrickson, Guthery, Westhoff, and Benson

  3. Reporting Groups • Spacecraft and Payload (Project Level) • Project coordination • Communication • Synchronize • Ground Test and Flight Test (More Detailed) • Support Payload Lead • Synchronize • support each other • consistency • Analysis vs test • Simulation • Technical Teams (More Detailed) • Support Spacecraft Lead • Structures, Mechanics, and Thermal • Power • Trajectory and GN&C • Command and Data Handling • Simulation

  4. Risk Analysis • Sample Sources of Risk • Unrealistic schedule • Inadequate staffing or skills • New technology • Test failures • Operational hazards • Poor requirements • Infeasible design • Unavailable technology • Poor quality assurance • Design deficiencies 5 HIGH 4 3 Likelihood MODERATE 2 LOW 1 Little or no potential for increase in cost, schedule disruption, or degradation of performance 1 2 3 4 5 May cause some increase in cost, schedule disruption, or degradation of performance Consequence Likely to cause significant increase in cost, schedule disruption, or degradation of performance

  5. Report Content • Schedule Status • On schedule? Ahead of schedule? • Behind schedule? • Recovery plan • What’s going well? • Problems - and Solutions • Risk Analysis status • What do you need?