1 / 20

Beam Diagnostics Challenges

Beam Instrumentation at Fermilab. AD-Instrumentation Department activities~30 techs, EEs and accelerator physicistsOperation, maintenance, improvements on RunII, NuMI, SY (M-Test) and many other beam diagnostics (>1000 units).Support upcoming projects and facilities, NoVA, proton improvement plan

duc
Download Presentation

Beam Diagnostics Challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Beam Diagnostics Challenges Wim Blokland – ORNL / SNS Dave Johnson, Peter Prieto, Gianni Tassotto, Randy Thurman-Keup, Vic Scarpine, Dan Schoo, Dave Slimmer, Duane Voy, Arden Warner, Manfred Wendt, Jim Zagel, and many others – Fermilab

    2. Beam Instrumentation at Fermilab AD-Instrumentation Department activities ~30 techs, EEs and accelerator physicists Operation, maintenance, improvements on RunII, NuMI, SY (M-Test) and many other beam diagnostics (>1000 units). Support upcoming projects and facilities, NoVA, proton improvement plan, HINS (MDB), ILC-TA (NML), mu2e, g-2,… R&D for future projects and facilities, e.g. Project X, still a little bit ILC, various collaboration activities. Good foundation for standard beam instruments Read-out systems applying digital signal processing techniques for beam intensity and orbit (BPM) monitoring Integrated calibration techniques. Many improvements on beam profile monitors, e.g. SEMs.

    3. The High Beam Power Challenge Fermilabs intensity frontier future requires High beam power, today ~300 kW (NuMI), soon ~700 kW (NOvA), in the future > 2 MW (Project X). Non or minimum invasive beam diagnostics detectors with low residual losses. Possible solutions: It is simple (solved) for electromagnetic beam detectors (toroids, WCM, BPM). Not trivial for transverse beam profile (emittance) measurements! Flying or scanning wires, SEM mulitwires: invasive. Ionization profile monitor (IPM) based on residual gas. Laser wire photo-detachment (requires H- beams) Electron-beam scanner.

    4. SEM Multiwire

More Related