1 / 5

VSS – Voltage Support Reporting

VSS – Voltage Support Reporting. Request of ROS member at August Meeting. Request. Problems. Confidentiality Protocol 1.3.1.1 – Items Considered Protected Information

dstuart
Download Presentation

VSS – Voltage Support Reporting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VSS – Voltage Support Reporting Request of ROS member at August Meeting

  2. Request

  3. Problems • Confidentiality • Protocol 1.3.1.1 – Items Considered Protected Information • (6) ERCOT Dispatch Instructions identifiable to a specific QSE, except for OOMC and OOME deployments as provided in Section 6.5.10, Out of Merit Capacity and Out of Merit Energy Services, items 10,11,and 12. • None of the Exceptions specified in section 1.3.6 appear to apply.

  4. Problems • Process • ERCOT does not issue instructions to produce “X” MVAR of reactive, but requests participants to hold a specified voltage value. Thus the “MVAR requested above URL” portion of this form is difficult for ERCOT to provide.

  5. What ERCOT can provide • VDI instructions which direct VSS service without naming specific resources or amounts. • Example: on August 14th at 16:20 ERCOT issued a VSS instruction in the Corpus Christi area to increase voltage 2 kv

More Related