190 likes | 320 Views
György Seres: Bases of military system modeling. Selections from history of general system theory. S elections from history of general system theory. Effective defense against air attack or submarines can be realized by a concerted military system only.
E N D
György Seres:Bases of military system modeling Selections from history of general system theory
Selections from history of general system theory • Effective defense against air attack or submarines can be realized by a concerted military system only. • That’s why the general system theory and the cybernetics were born in the time of Second World War in England. • Large integrated military systems could not have been created in absence of theoretical results of military R&D.
“”The nature of modern warfare demands that we fight as a joint team. … Joint Vision 2010 provides an operationally based template for the evolution of the Armed Forces for a challenging and uncertain future. ….” John M. ShalikashviliChairmanof the Joint Chiefs of Staff Selections from futureof military systems
“”The nature of modern warfare demands that we fight as a joint team. … Joint Vision 2010 provides an operationally based template for the evolution of the Armed Forces for a challenging and uncertain future. ….” John M. ShalikashviliChairmanof the Joint Chiefs of Staff By US Army
Digital battlefield
„Air Force 2025” The Air Force University conducted a study to identify the concepts, capabilities, and technologies the United States will require remaining the dominant air and space force in the first quarter of the 21st century. The study was called Air Force 2025. By US Air Force
By NMD Team The primary mission of National Missile Defense is defense of the United States (all 50 states) against a threat of a limited strategic ballistic missile attack from a rogue nation. Although intended to protect the United States only, the proposed NMD system will not work without the use of radars in Europe or in territories controlled by European countries.
First conclusion Only two type ofweapons were developed, against which wasn’t effective defense!
Only two types ofweapons were developed against which wasn’t effective defense! Nuclear weapon Club &
The SDI was planned as defensive tool against nuclear weapon It hasn’t beenrealized,but as a result the USSR collapsed
Nevertheless, which defense tool did save the earth from thenuclear war?
Nevertheless, which defense tool did save the earth from thenuclear war? It is the remembrance of Hiroshima and Nagasaki! This “tool” kept Stalin and Truman in 50’s, Khrushchev and Kennedy in 60’s, and leaders of the rogue nations nowadays back from using of nuclear weapons.
Thank you for attention Dr. György Seres drseres@jata.org http://www.jata.org/drseres/