For more information please contact canada techs operation analysis
Download
1 / 26

- PowerPoint PPT Presentation


  • 136 Views
  • Uploaded on

For More Information Please contact Canada Techs Operation Analysis. Human Factors R. Z. Angila. If Methods Engineering Focuses Primarily on improving productivity though (re)design of:. Motivation: Incentives/rewards. Organizational structure. Work Process. Work operations. Tools

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - dinah


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
For more information please contact canada techs operation analysis

For More Information Please contact Canada TechsOperation Analysis

Human Factors

R. Z. Angila


If methods engineering focuses primarily on improving productivity though re design of
IfMethods Engineering Focuses Primarily on improving productivity though (re)design of:

Motivation:

Incentives/rewards

Organizational

structure

Work Process

Work operations

Tools

(Products)

Work environment


Then operations analysis focuses primarily on improving productivity though re design of
ThenOperations Analysis Focuses Primarily on improving productivity though (re)design of:

Motivation:

Incentives/rewards

Organizational

structure

Work Process

Work operations

Tools

(Products)

Work environment


The 9 primary approaches to operation analysis

Operation Purpose

Part Design

Tolerances and Specs

Material

Manufacturing Sequence and Process

Setup and Tools

Material Handling

Plant Layout

Work Design

The 9 Primary Approaches to Operation Analysis

Also consider: management and reward changes


Simultaneously consider many ways of making improvements
Simultaneously consider many ways of making improvements!


1 operation purpose
1. Operation Purpose

Ask:

  • “Does this operation serve a useful purpose?”

  • “Is this operation really needed?”

    Try to:

  • Eliminate operations

  • Combine operations

    As many as 25% of operations in American Industry can be eliminated.


Example 1 operation elimination
Example 1: Operation Elimination

  • Many stores have dropped the requirement that customers sign their credit slip for small totals: less than $15 - $50.

  • This makes the payment transaction very fast!

    • E.g. in coffee shop study,

      Average payment transaction time: 27 sec


Example 2 operation elimination outsource operations
Example 2: Operation Elimination Outsource operations

  • Ask: “Can a supplier an operation more economically than we can in-house?”

  • Operation: pack ball bearings in grease

  • Modification: purchase sealed bearings from supplier.


Example 3 operation elimination eliminate re work
Example 3: Operation Elimination Eliminate re-work

Coffee shop worker:

  • Worker pours milk into stainless steel beaker,

  • Steams milk, pours into cup.

  • Runs out of milk – must pour and steam more while customer waits impatiently.

    Solution:

  • Add measuring lines to inside of beaker so worker does not have to estimate how much milk to pour.


2 part design design for manufacturing and life cycle
2. Part DesignDesign for manufacturing and life-cycle

  • Reduce parts – simplify designs

  • Reduce processing operations

  • Utilize better material

  • Loosen tolerances where possible

  • Design for manufacturing: choose an easy to manufacture shape over a difficult one.


Minimum cost design
Minimum cost design

  • It helps designers if they understand processes such as: casting, molding and punching, bending, etc.

  • Example: instead of:

    • Four bends in sheet metal to make part,

    • Make lower cost extrusion with 4 bends already in it.

  • This type of thinking is called

    “Design for Manufacturing”


3 tolerances and specifications
3. Tolerances and specifications

  • Designers tend to incorporate tolerances that are more rigid than necessary

  • Why? To be extra sure that product will function in all situations.

  • It is perceived to reduce risk, but it can add much unnecessary cost,

  • Need to consider risk/cost trade-off.

  • Taguchi (86) methods develop quality products and reduce cost.


4 material
4. Material

  • Incorporate better, more economical material in designs:

    • Less expensive

    • Easier to process

    • Use materials more economically

    • Use supplies and tools more economically,

    • Standardize materials

    • Find best vendor: price, stock. Can achieve 10% to 15% reductions by shopping around, sometimes every year.


Example new material
Example: New material

  • Substitute glass tubing for Micarta spacer bar in transformer. (Micarta is a glass cloth, epoxy resin laminate material)

     less expensive and better cooling

  • Replace stamped gear with plastic gear in assembly.

     saved $0.13 per unit, $10,000 per year.

    Keiretsu: (Japanese term) interlocking relationship between manufacturers and suppliers.


5 manufacturing sequence and tools
5. Manufacturing Sequence and Tools

  • Re-sequence operations

  • Group operations that can share common fixturing

  • Mechanize manual operations where economically feasible (see section on setup)

  • Use more efficient facilities (see section on layout) Example, substitute Super automatic cappuccino machines for old style.

  • Manufacture near-net shape.

  • Use Robots (where economically feasible – usually for long product runs, small product variability)


Example re sequencing
Example: re-sequencing

Original sequence:

  • Paint part 1

  • Paint part 2

  • Paint part 3

  • Paint part 4

  • Rivet parts together

    New sequence:

  • Rivet parts together

  • Paint one assembly


6 setup tools and fixtures
6. Setup, Tools and Fixtures

  • Carefully consider economic trade-offs:

    • Will the setup, fixtures, or tools be used enough to justify their expense?

  • Prevalent mistake of tool makers and planners:

    • Too much specialized tooling and fixturing


Example tooling
Example: Tooling

  • Good choice: Tooling that saves 10% on each job and is used frequently.

  • Poor choice: Tooling that saves 90% on each job but is used only twice a year. (Will not recover expense of creating and storing tooling).


7 material handling
7. Material Handling

The best way to handle material is NOT to handle it.

  • Moving, storing, positioning, tracking.

  • Insuring that materials get where they need to be when they are needed.

  • Material Handling Institute survey says 35 to 85% of the cost of getting a product to market is associated with material handling.


Better material handling
Better material handling:

  • Reduces cost, time

  • Increases safety, health and well being of workers:

    • 40% of plant accidents happen during material handling

    • 25% are caused by lifting and shifting material


Approach to reducing material handling time
Approach to reducing material handling time

  • Reduce time spent picking up material

  • Use mechanized of automated equipment (where economically feasible)

  • Make better use of existing handling facilities

  • Handle material with greater care

  • Consider bar coding


8 plant layout
8. Plant Layout

  • Poor layout can result in major costs through increased travel time, increased material handling, etc.

  • Two types of layouts for plants:

    • Product layout: machines placed in the order used in the manufacturing process.

      Advantage: reduces travel time

    • Process layout: machines grouped by type: e.g. all lathes together, all drill presses together, etc.

      Advantage: makes training easier.

  • Later we will discuss Muther’s Systematic Layout Process (SLP).


9 work design
9. Work Design

  • Eliminate operations,

  • Re-sequence, re-design operations

    Many of our remaining chapters focus on many different types of work design!


Muther s 1973 systematic layout process slp

Chart out relationships between areas based on magnitude of material handling,

Establish space requirements,

Make activity relationship diagrams

Space relationship layout

Evaluate alternative layouts

Select best layout, plan installation.

Muther’s (1973) Systematic Layout Process (SLP)

Goal: identify how to rearrange space to make it more effective for a task.


Decision matrices
Decision Matrices material handling,

A performance parameter is whatever is important to the decision maker in the

situation,

“Goodness” score for each option i is Σ (importance weight j * performance score i j)

Performance Parameters

Performance score, where 4 = best, -1 = unacceptable


6 select the best layout for your purposes

1. material handling,

2.

3.

6. Select the best layout for your purposes

88

  • Choose the Layout with the highest “score” from your decision matrices

89

92

Best!