WP2 summary of activities at Oxford

WP2 summary of activities at Oxford. Dr B Camanzi On behalf of the University of Oxford Group. Outline. Experimental set-up SiPM characterisation Timing resolution studies Summary. Equipment: SiPMs and crystals. Experimental set-up.

dillon
Download Presentation

WP2 summary of activities at Oxford

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP2 summary of activities at Oxford Dr B Camanzi On behalf of the University of Oxford Group

  2. Outline • Experimental set-up • SiPM characterisation • Timing resolution studies • Summary ENVISION WP2 Meeting Lyon 03/02/11

  3. Equipment: SiPMs and crystals ENVISION WP2 Meeting Lyon 03/02/11

  4. Experimental set-up • Two-channel demonstrator: Hamamatsu 3x3mm2 50 mm + LaBr3(Ce) • 22Na source • Electronics: • Preamps boards from Photonique: ~700ps rise time, gain 10x-20x • Keithley 2612A two-channel Sourcemeter 200V • DAQ: LeCroy WavePro 725Zi 2.5GHz oscilloscope Scope Keithley 22Na source Two-channel demonstrator system ENVISION WP2 Meeting Lyon 03/02/11

  5. Studies carried out so far • SiPM characterisation • I-V curves and breakdown voltages • Rise time measurements • Single photon signal • Timing resolution studies of a two-channel demonstrator: • Timing resolution at SiPM Vbias recommended by manufacturer • Timing resolution as function of SiPM Vbias ENVISION WP2 Meeting Lyon 03/02/11

  6. SiPM characterisation ENVISION WP2 Meeting Lyon 03/02/11

  7. Breakdown voltage Hamamatsu 3x3mm2 50mm Courtesy M Ahmed ENVISION WP2 Meeting Lyon 03/02/11

  8. Rise time studies Laser Width: 50ps LED Width: 2ns Courtesy M Ahmed ENVISION WP2 Meeting Lyon 03/02/11

  9. Single photon signal • Run: 80000 events • Preamp gain: 15x about 2ns ~6mV Courtesy M Ahmed ENVISION WP2 Meeting Lyon 03/02/11

  10. Future work • Acquire faster, low-noise, higher gain preamps • Repeat and finish SiPM characterisation with new preamps • Perform timing resolution studies of single SiPMs and SiPM pairs • Select best SiPM candidate(s) ENVISION WP2 Meeting Lyon 03/02/11

  11. Timing resolution studies ENVISION WP2 Meeting Lyon 03/02/11

  12. Pulse Magnitude 18000 16000 14000 12000 10000 Number of Events 8000 6000 4000 2000 0 0 0.5 1 1.5 2 2.5 3 3.5 4 Magnitude (V) Timing resolution at fixed Vbias • Run: 15000 events • Hamamatsu 3x3mm2 50mm + LaBr3(Ce) crystals • Timing resolution = s • Used Vbias recommended by Hamamatsu: 71.28V and 71.31V Ch 1 = red Ch 2 = blue Courtesy M Ahmed ENVISION WP2 Meeting Lyon 03/02/11

  13. Timing resolution – vs. – Vbias • Runs: 50000 events • Hamamatsu 3x3mm2 50mm + LaBr3(Ce) crystals • Timing resolution = s • Used narrowest windows around 22Na peak • Best timing resolution of 298ps at 71.1V = 0.18-0.21V below recommended Vbias Courtesy M Ahmed ENVISION WP2 Meeting Lyon 03/02/11

  14. Future work • Improve two-channel demonstrator set-up: SiPM-crystal coupling, alignments, etc. • Investigate SiPM-crystal coupling • Understand effects on timing resolution of LaBr3(Ce) crystal's different geometries and Ce concentration • Continue timing resolution studies of two-channel demonstrators: different SiPM types and also LYSO crystals ENVISION WP2 Meeting Lyon 03/02/11

  15. Summary • SiPM characterisation started: 1) breakdown voltages, 2) rise times, 3) single photon signal • Started study of timing resolution of two-channel demonstrator system: 298ps (s) • Future work: • Repeat and complete SiPM characterisation with new preamps and select best candidate(s) • Continue timing resolution studies ENVISION WP2 Meeting Lyon 03/02/11