An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCOHTS MeetingApril 29-May 1, 2009

  2. NCHRP Project 17-18 Report 500 Volumes 1-23 – Completed Final Volume Distributed in April 2009

  3. Human Factors Guide NCHRP Report 600A – Chapters 1-5, 10, 11-13 NCHRP Report 600B – Chapter 6 Project 17-41 – 5 Additional Chapters – June 2010 Project 17-47 – Remaining Chapters – June 2011

  4. Highway Safety Manual Final Draft Delivered to AASHTO April 2009

  5. Completed NCHRP Projects • Report 612 – Safe and Aesthetic Design of Urban Roadside Treatments (Project 16-04) • Report 617 – Accident Modification Factors for Traffic Engineering and ITS Improvements (Project 17-25)

  6. Completed NCHRP Projects • Report 622 – Effectiveness of Behavioral Highway Safety Countermeasures (Project 17-33) • Report 627 – Traffic Safety Evaluation of Nighttime and Daytime Work Zones (Project 17-30)

  7. Project 17-32 – Guidance for the Design and Application of Shoulder and Centerline Rumble Strips • Project Completed • To be Published as NCHRP Report 641

  8. NCHRP FY2010 Funding (est.) - $ 27.7 M Safety Projects - $ 2.5 M

  9. FY2010 Approved NCHRP Safety Projects • 22-20(2) – Design of TL-5 Roadside Barrier Systems Placed on MSE Retaining Walls • 16-05 – Development of Cost Effective Treatments of Roadside Ditches to Reduce the Number and Severity of Roadside Crashes • 17-46 – Comprehensive Analysis Framework for Safety Investment Decisions

  10. FY2010 Approved NCHRP Safety Projects • 17-47 – Human Factors Guidelines for Road Systems – Phase IV • 17-48 – Development of a Strategic National Highway Infrastructure Safety Research Agenda

  11. CRP Homepagehttp://www.trb.org/crp/about/divd.asp • Information on CRP Programs • Search Engine • All research Projects since 1988 • Project Statements (requests for proposals) • Anticipated projects • CRP publication lists and how to order them • Registration form for receipt of RFPs