1 / 21

Computer Residuals De-manufacturing Method and Its Economic Value

Computer Residuals De-manufacturing Method and Its Economic Value. Project Site: PSE&G Resource Recovery Center Paulsboro, N.J. Group Members: Sheila Navarro Hazel Savellano Rebecca Sutton. Dilbert by Scott Adams. Outline. Problem Statement Current Solution Scope of Project

Download Presentation

Computer Residuals De-manufacturing Method and Its Economic Value

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Computer ResidualsDe-manufacturing Method and Its Economic Value Project Site: PSE&G Resource Recovery Center Paulsboro, N.J. Group Members: Sheila Navarro Hazel Savellano Rebecca Sutton

  2. Dilbert by Scott Adams

  3. Outline • Problem Statement • Current Solution • Scope of Project • Operational Analysis • Economic Analysis • Recommendations • Conclusion

  4. Problem Statement • Approximately 2000 computers per year • 50% refurbished and donated • 40% remanufactured and resold • 10% residual Problem: What to do with the residuals?

  5. Current Solution Contracted to outside source • Take Monitors and CPU • Storage required • Optimal truckload capacity • “Out of sight, out of mind.”

  6. Scope of Project Alternative Solution • Establish a method of de-manufacturing • consider CPU only • environmental issues with monitors • Economic evaluation against current solution • target costing • break-even analysis • comparing alternatives

  7. Operational Assumptions • IBM family of CPU • Optimal working environment • Tools allow for easiest disassembly

  8. Establishing the Work Standard MOST (Maynard Operation Sequence Technique) • Predetermined motion time system • Determines amount of time required • planning • performance rating • establishing costs

  9. Basic MOST Technique • General Move (for movement of object through air) • Controlled Move (for the movement of object in contact with surface or other object) • Tool Use (for use of hand tools)

  10. Application of MOST Removing Fasteners or Screws LH: A1 B0 G3 A1 B0 P1 A1 RH: A1 B0 G1 A1 B0 (P3 A0 L16) A1 B0 P1 A0

  11. Operations of Disassembly Remove Metal Casing Remove Power & Data Cables from Floppy Drive Unfasten Floppy Drive Unfasten Supporting Bar

  12. Operations of Disassembly Remove Support & Floppy Drive Remove Power & Data Cables from Power Supply Remove Mother Board Unfasten& remove PowerSupply

  13. Operations of Disassembly UnfastenDriveHousing RemoveRubberFeet Work Area ** Pictures taken from actual disassembly at PRCC**

  14. Work Method Results • Assume 2 hour work period per day • Allowances taken into consideration (26%) • Use of force, energy 5% • Mental Strain 1% • Monotony 1% • Personal allowance 5% • Unavoidable delay 10% • Basic fatigue 4% De-manufacturing rate for one unit: 8.16 units per hour = 7.35 minutes per unit

  15. Economic Assumptions • Costs are analyzed as present economy studies • Analysis designed to break-even • No MARR

  16. Economic Data Outside service costs: Labor = $10 per unit Transportation = $1.70 per unit Total = $11.70 per unit* * prices based on full capacity truck load

  17. Tools and Equipment * • Computer Screwdriver $20.55 • Grip Floor Mat $14.79 • Hammer $5.91 • Industrial Stool $59.38 • Protective Eyewear $3.77 • Utility Bar $4.24 • Utility Knife $0.59 • Utility Table Bin $0.45 • Wire Cutter $9.90 • Wood Table $310.00 • Worker’s Gloves $6.50 *(unit prices)

  18. Target Cost Analysis * U.S. Department of Labor, Bureau of Labor Statistics - March 1998

  19. Cost & Time Evaluation • Equipment cost per worker = $286.03 • Set-up cost of $1,893.47 = 6 workers • Disassembly rate for 200 units = 24.5 hours

  20. Recommendations • Demanufacturing task as part of unused computer handling operation • Schedule 2 workers per week for demanufacturing • Set-up 2 workstations • 1 workstation for CPU disassembly • 1 workstation for sub-disassembly • Set-up cost = $572.06

  21. Final Thought Implementing an efficient de-manufacturing operation will result in a 70% cost reduction.