Ground Support Unit. Serco Update Serco contractors do not leave R-5 Serco work hours- Minimum 14 Hrs Maximum 16 Hrs Parts ordering done by D.G.R. Ordered through normal procedures D.G.R. (Designated Government Rep.) Training in place Contract with Serco is bid on current shop rate

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Ground Support Unit' - dick


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Slide2 l.jpg

Serco Update

Serco contractors do not leave R-5

Serco work hours-

Minimum 14 Hrs

Maximum 16 Hrs

Parts ordering done by D.G.R.

Ordered through normal procedures

D.G.R. (Designated Government Rep.) Training in place

Contract with Serco is bid on current shop rate

Serco can work on all incident equipment, not just Region 5

They do not work on air brakes

If on a non FS Incident, there are 2 strike teams

Of F.S. Engines, Serco will be ordered


Slide3 l.jpg

A list of non-compliance issues, a DGR list, and incident support portions of the Contract will be posted on the NLW.Website

Ordering for Serco is done by the “Host” Forest, the COR is notified, then he/she will order the DGR through the Dispatch System. Closest forces DGR will be used. “O” numbers are used for Serco and DGR

Questions on F.S.

Questions on EIRS Trailer availability will be followed upon


Eatis dick reynolds l.jpg

EATIS (Dick Reynolds) support portions of the Contract will be posted on the NLW.Website


Slide5 l.jpg

Contracting Staff sets rates based on industry standards support portions of the Contract will be posted on the NLW.Website

EATIS provides a standard database,

USFS R-6 had pilot program, R-5, R-1 will participate this year (2006)

Specifications and best value criteria have been written for Engines, Tenders and Busses. Dozers are next along with excavators for 2007

GS unit will have oversight on performance ratings. Tactical equipment is Operations Responsibility

Performance ratings will be entered into EATIS


Slide6 l.jpg

In 2006, all equipment will get performance ratings-toilets to tenders

R-6 has performance data available. Vendors are aware of requirement. Form I-224 rating will be used for now for ratings form until new forms are developed for 2007

Best value criteria is based on a point system set by the ICS type (For WTs), and GVW. Spray bar configuration is also criteria

EATIS vendor cirteria is based on equipment location by zip code. Best value will be tabled in ROSS in 2007. No more rotations for equipment.

There is a possibility that EERA vendors will be eliminated from the system


Slide7 l.jpg

DAV set-asides will be included and have a BV table of their own, and will be first out

Dispatch centers will have tables for activation

GS Unit needs to be aware of what equipment is signed up on Incident. For Demob it is the IMT’s choice on what equipment to release.

Question on using tribal equipment not in EATIS database. IMT’s will be made the choice.

All equipment will have a pre-season inspection, as well as pre-use. Info is put into EATIS database. Buses will use current USDOT inspections.

All equipment in EATIS will be I.D. by Vin number


Slide8 l.jpg

Solicitations this year in R-1 and R-5 will be on one-year increments. Next year will be on a 3-year solicitation

Operators need to be qualified

Non-Federal cooperators do not need to be in EATIS.

Question on Dozer/Transport “Best value” issue. This is still being figured out.


Slide9 l.jpg

AD driving policies increments. Next year will be on a 3-year solicitation

New FS Draft Policy

Put on NLW Website

Have local units establish policies and have in place for IMT’s

Rental vehicle management

Think Ahead


New items l.jpg

New Items increments. Next year will be on a 3-year solicitation


Slide11 l.jpg

R-4 Signing Policy increments. Next year will be on a 3-year solicitation

8 sets of signs for GBK

Develop contents of sign kit

20 empty sand bags

“Fire Acitivity Ahead 4 ea/2 Sets

“Incident Base” 6 ea with changeable arrows

“Helibase 4 ea

“Fire Traffic Entering Highway” 2 ea

“Drop Point” 10 ea with 2 sets of 1-10

“Incident Sign Mgmt Book 6 ea

“MUTCD handbook” 1 ea

All signs to be placed on tripods

Extra Velcro

Sign sources Dickey Sign and Safety Co.


Slide12 l.jpg

AD Personnel using personal vehicles increments. Next year will be on a 3-year solicitation

Paid for mileage only, not daily rate

Other personal equipment (R.V.’s, Campers, Etc.) are the discretion of the Incident


Bin items l.jpg

BIN ITEMS increments. Next year will be on a 3-year solicitation

(1) Development of Contract Administration Skills

(a) Cost of Training

(b) Knowledge of Contracts

(c) How to keep up currency

(2) Keeping Ads current and available. Address authority of AD’s to act as COR

(3) Develop a “Contract for Administration for IMT’s” Session