4x5 SC arrayfor the test beamin Apr 2007 Dee Calibration Apr 2007 D Cockerill, 10 April 2006
VPT sorting by SC position Old data Mean ~33 e/MeV now D Cockerill, 10 April 2006
SC region on Dee Backplate angle as for beam from CMS I.P. =2.5 =1.57 TT26 TT19 D Cockerill, 10 April 2006
Appropriate any five trigger mapping DCCboundary TCCboundary ‘Any 5’ trigger map D Cockerill, 10 April 2006
Dee patch panel H4 control room Short fanout trunk cable MPO MPO Readout needed for 20 SCs 100 trigger GOH 20 data GOH Short fanouts on Dee FE – DCC 20 optical lines = 2 short fanouts (24 lines) FE – TCC 100 optical lines = 9 short fanouts (108 lines) MEM 24 optical lines = 2 short fanouts Totals 144 optical lines 13+1 = 14 short fanouts MPO trunk cables from Dee to H4 CR (barrel had MFS trunk cables at SM10 end) 2 trunk cables 2*96 = 192 lines +1 trunk cable for CCS/token rings/MEM D Cockerill, 10 April 2006
Additional info D Cockerill, 10 April 2006
Noise across Dee Transverse noise across Dee, VPTs sorted ET from 30 – 60 MeV (old normalisation) D Cockerill, 10 April 2006