1 / 33

Solar Case Studies for Tax Exempt Entities

Solar Case Studies for Tax Exempt Entities. Presented By: Richard Raeke Director of Project Finance Borrego Solar Systems, Inc. Financing Options for Tax Exempt Entities. Solar is expensive at roughly $7,000/kilowatt (or $0.45/kWh)

derron
Download Presentation

Solar Case Studies for Tax Exempt Entities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Case Studies for Tax Exempt Entities Presented By: Richard Raeke Director of Project Finance Borrego Solar Systems, Inc. www.borregosolar.com

  2. Financing Options for Tax Exempt Entities • Solar is expensive at roughly $7,000/kilowatt (or $0.45/kWh) • On a typical solar project, the federal tax incentives pay for more than 1/3, local or state incentive programs pay for 1/3 and the last 1/3 comes from debt or owner equity. • As tax-exempt entities, universities cannot receive the federal Investment Tax Credit/Grant and bonus depreciation on a purchase. • Tax Exempt Entities have to look to more creative structures, such as PPAs, in order to monetize the tax credits. • Without monetizing the tax credit, a customer would have to look to another funding source, such as grants or donations to make the system economically viable.

  3. A Power Purchase Agreement (PPA) • Long term agreement to purchase electricity from a third party financier (PPA Provider) – 20 year terms, predictable cost increases • No equipment to purchase, no capital investment • No annual maintenance expense, no asset to manage • Customers purchase only the power produced by the system

  4. State Solar Programs • Solar PV works in states with viable incentive programs • Massachusetts – Commonwealth Solar Initiative • California – Production Based Incentive (PBI) • New Jersey – SREC program • Others include Connecticut, New York, Pennsylvania, Arizona, Colorado, New Mexico, Oregon and Hawaii • The ARRA • Stay tuned – incentive programs are evolving.

  5. Case Study: Boston Community Capital • Boston Community Capital received $10 million from Massachusetts through the Green Affordable Housing Initiative • BCC had mission of creating the most economical solution for putting on solar on affordable housing statewide • BCC issued an RFP for an installation/financing partner • Chose Borrego to help identify best sites and install systems • Letters sent to dozens of affordable housing owners across state • Based on responses, Borrego began evaluating sites • BCC created a PPA provider – Solar Energy Advantage Program • Five initial sites – Cambridge, Charlestown, Webster and Pittsfield • Second round of installations to follow this year Generate Change. Choose Solar.

  6. Case Study: Cambridge Housing Authority Washington Elms: PPA Solution • Boston Community Capital PPA • 100 KW • Sharp 175 modules • SMA inverters • Uni Rac ULA racking • 15 degree tilt – SSW • Solar on 6 buildings • Reduce common load kWh by 60% • 20 year $.165 / kWh PPA • Annual 1.25% escalator Generate Change. Choose Solar.

  7. Case Study: Cambridge Housing Authority Washington Elms • 100 KW • Sharp 175 modules • SMA inverters • Uni Rac ULA racking • 15 degree tilt - SSW Generate Change. Choose Solar.

  8. Case Study: Cambridge Housing Authority Washington Elms: Roof Mounts and Racking Generate Change. Choose Solar.

  9. Case Study: Cambridge Housing Authority Washington Elms: Roof Mounts and Racking Generate Change. Choose Solar.

  10. Case Study: Cambridge Housing Authority Washington Elms: Roof Mounts and Racking Generate Change. Choose Solar.

  11. Case Study: Cambridge Housing Authority Washington Elms: Electrical Conduit Installation Generate Change. Choose Solar.

  12. Case Study: Cambridge Housing Authority Washington Elms Generate Change. Choose Solar.

  13. Case Study: Cambridge Housing Authority Washington Elms: Module Installation Generate Change. Choose Solar.

  14. Case Study: Cambridge Housing Authority Washington Elms: Module Installation Generate Change. Choose Solar.

  15. Case Study: Cambridge Housing Authority Washington Elms: Inverter Installation Generate Change. Choose Solar.

  16. Case Study: Cambridge Housing Authority Washington Elms: Completed Arrays Generate Change. Choose Solar.

  17. Case Study: Cambridge Housing Authority Washington Elms: Completed Arrays Generate Change. Choose Solar.

  18. Case Study: UCSD • Borrego won RFP issued by UCSD • Partnered with Solar Power Partners to provide financing • Borrego signs EPC contract with SPP • SPP signs PPA with UCSD • Roughly $0.15/kWh • 20 year contract • UCSD keeps RECs • UCSD provides insurance

  19. Case Study: UCSD • Site Evaluation • Customer preferences • Electricity consumption • Cost per kWh • Available space • Meter location • Trenching • Conduit runs Generate Change. Choose Solar.

  20. Case Study: UCSD Prefabrication of arrays Generate Change. Choose Solar.

  21. Case Study: UCSD Carport Construction Crane day Generate Change. Choose Solar.

  22. Case Study: UCSD Carport construction Generate Change. Choose Solar.

  23. Case Study: UCSD Generate Change. Choose Solar.

  24. Case Study: UCSD Generate Change. Choose Solar.

  25. Case Study: Padre Dam Municipal Water District • 862 kW of thin film over three sites and on 15-foot tall carports • 546 day sales process • Borrego awarded RFP • Expensive installation due to carports • Borrego signed PPA and Site-Lease Agreement with Padre Dam • Section 48 ITC faced expiration system needed completion by Dec. 31 • Borrego assigned PPA to a third-party at quoted price • EPC negotiations finished mid-September 2008 • Construction finished and system interconnected mid-December • Bonus depreciation preserved Generate Change. Choose Solar.

  26. Case Study: Padre Dam www.borregosolar.com

  27. Case Study: Padre Dam www.borregosolar.com

  28. Case Study: Padre Dam www.borregosolar.com

  29. Case Study: Padre Dam www.borregosolar.com

  30. Case Study: Padre Dam www.borregosolar.com

  31. Case Study: Padre Dam www.borregosolar.com

  32. Case Study: Padre Dam www.borregosolar.com

  33. Solar Case Studies for Tax-Exempt Entities Richard Raeke Director of Project Finance Borrego Solar Systems, Inc. rraeke@borregosolar.com (510) 849-5414 www.borregosolar.com www.borregosolar.com