An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil Works Baltimore District River and HarborProjects

  2. FY06 FY07 FY08 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Scheduled FY07 Dredging Work in Baltimore District Hopper Dredge Maintenance Dredging Atlantic Coast of Maryland, MD & DE Award Apr 13, 06 850 KCY Tourism Baltimore Harbor & Channels, VA - Cape Henry/York Spit Sea Turtles 400 KCY Sea Turtles - Screens and Observers Page 1 of 1

  3. PROJECT: Atlantic Coast of MD TYPE WORK: Renourishment QUANTITY: 800,000 cy TYPE OF MATERIAL: Sand BORROW AREA: 9 NOURISHMENT AREAS: 33rd Street and north of 60th Street DISTANCE FROM BORROW TO BEACH: 3-7 Miles TYPE OF EQUIPMENT: Hopper SMALL BUSINESS SET ASIDE: No LAST NOURISHED: 2002 ENVIRONMENTAL WINDOW: Sep 7 – Jun 30 REASON FOR WINDOW: Tourism ADVERTISING: Feb 28, 2006 BID OPENING: Mar 31, 2006 AWARD: Apr 13, 2006 CONTRACT: $6,674,769.25 CONTRACTOR: Weeks Marine

  4. Ocean City, Maryland, Looking North from Ocean City Inlet

  5. Ocean City, Maryland, Looking North

  6. Erosion at 70th – 79th Street

  7. Atlantic Coast of Maryland Renourishment

  8. PROJECT: Baltimore Harbor & Channels, VA - Cape Henry & York Spit Channels TYPE WORK: Maintenance DEPTH: 50 Feet WIDTH: 1,000 and 800 Feet LENGTH: 3 and 18 Miles QUANTITY: 400,000 cy TYPE OF MATERIAL: Sand PLACEMENT AREAS: Dam Neck Ocean and Wolf Trap Alternate DIST. TO PLACE. AREA: 7 Mi TYPE OF EQUIPMENT: Hopper SMALL BUSINESS SET ASIDE: No LAST DREDGED: 2006/2004 ENVIRONMENTAL WINDOW: Dec 1 – Mar 31 REASON FOR WINDOW: Sea Turtles FY 07 FUNDING: $1,500,000 ADVERTISING DATE: Dec 06 BID OPENING DATE: Jan 07 AWARD DATE: Jan 07

  9. FY06 FY07 FY08 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Scheduled FY07 Dredging Work in Baltimore District Hydraulic Pipeline Dredge Maintenance Dredging Wicomico River, MD Awarded July 25, 2006 Oysters 99 KCY Anadromous Fish Oysters Knapps Narrows, MD Awarded Sep 29, 2006 Oysters 43 KCY Oysters Oysters Tilghman Island Harbor, MD Awarded Sep 29, 2006 Oysters 11 KCY Oysters Oysters Poplar Island, MD 900 KCY Page 1 of 1

  10. PROJECT: Wicomico River, MD TYPE WORK: Maintenance DEPTH: 14 Ft. WIDTH: 150 Ft. LENGTH: 10 miles. QUANTITY: 99,000 c.y. TYPE OF MATERIAL: Silt/Clay PLACEMENT AREA: Upland DISTANCE TO PLACEMENT AREA: 1-2 miles TYPE OF EQUIPMENT: Hydraulic cutterhead pipeline SMALL BUSINESS SET ASIDE: Yes LAST DREDGED: 2005, 2000, 1998 ENVIRONMENTAL WINDOW: June 16 – February 14 REASON FOR WINDOW: Anadromous fish spawning FY 07 FUNDING: $800,000 ADVERTISING DATE: May 5, 2006 BID OPENING DATE: June 13, 2006 AWARD DATE: July 25, 2006 CONTRACT: $368,750 (Base only) $1,444,271 (Options) CONTRACTOR: Cottrell Contracting Corp.

  11. PROJECT: Knapps Narrows, MD TYPE WORK: Maintenance DEPTH: 9 Ft. WIDTH: 75 Ft. LENGTH: 9,000 Ft. QUANTITY: 43,000 c.y. TYPE OF MATERIAL: Sand/Silt/Clay PLACEMENT AREA: Wetland Creation, Shoreline Stabilization DISTANCE TO PLACEMENT AREA: 1-2 miles TYPE OF EQUIPMENT: Hydraulic cutterhead pipeline SMALL BUSINESS SET ASIDE: Yes LAST DREDGED: 2000 ENVIRONMENTAL WINDOW: October1-December 15, March 15 - June 1 REASON FOR WINDOW: Oysters REQUEST FOR PROPOSAL: Sep 7, 2006 PROPOSAL DUE: Sep 20, 2006 AWARD: Sep 29, 2006 CONTRACT: $850,000 CONTRACTOR: Coleman Construction

  12. Placement Site Knapps Narrows

  13. 2000 Shoreline Placement Site Knapps Narrows West End

  14. PROJECT: Tilghman Island Harbor, MD TYPE WORK: Maintenance DEPTH: 6 Ft. WIDTH: 60 Ft., Basin 500 x 200 Ft. LENGTH: 2,080 Ft. QUANTITY: 11,000 c.y. TYPE OF MATERIAL: Silts/clay/sand PLACEMENT AREA: Wetland Creation, Shoreline Stabilization DISTANCE TO PLACEMENT AREA: 2 miles TYPE OF EQUIPMENT: Hydraulic cutterhead pipeline SMALL BUSINESS SET ASIDE: Yes LAST DREDGED: 1996 ENVIRONMENTAL WINDOW: October 1 - June 1 REASON FOR WINDOW: Oysters FY 07 FUNDING: $0 REQUEST FOR PROPOSAL: Sep 7, 2006 PROPOSAL DUE: Sep 20, 2006 AWARD: Sep 29, 2006 CONTRACT: $500,000 CONTRACTOR: Coleman Construction

  15. Placement Site Tilghman Island Harbor

  16. Poplar Island Environmental Restoration Project

  17. PROJECT: Poplar Island Environmental Restoration, Cell 6 Closure, MD TYPE WORK: New Work/Construction DEPTH: 25 Ft. WIDTH: 400 Ft. . LENGTH: 4,300 Ft QUANTITY: 900,000 c.y. TYPE OF MATERIAL: Sand STOCKPILE AREA: Cell 4 DISTANCE TO STOCKPILE AREA: 1-2 miles TYPE OF EQUIPMENT: Hydraulic cutterhead pipeline SMALL BUSINESS SET ASIDE: No LAST DREDGED: 2006 to 15-20 Ft ENVIRONMENTAL WINDOW: January 1 – December 31 REASON FOR WINDOW: N/A FY 07 FUNDING: $6,000,000 ADVERTISING DATE: Dec 06 BID OPENING DATE: Jan 07 AWARD DATE: Feb 07

  18. FY06 FY07 FY08 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Scheduled FY07 Dredging Work in Baltimore District Mechanical Dredge Maintenance Dredging Baltimore Harbor & Channels (Awarded August 23, 2006) 2.0 MCY Drying at Poplar Island Baltimore Harbor & Channels Drying at Poplar & Hart-Miller 2.5 MCY State of Maryland New Work 3.0 MCY Seagirt Marine Terminal Masonville DMCF 1.5 MCY Page 1 of 1

  19. PROJECT: Baltimore Harbor & Channels, MD TYPE WORK: Maintenance DEPTH: 50 Feet WIDTH: 400 - 800 Feet LENGTH: 10 – 15 Miles QUANTITY: 2,000,000 cy TYPE OF MATERIAL: Silt and clay PLACEMENT AREAS: Poplar Island Environmental Restoration Project DIST. TO PLACE. AREA: 20 -30 Miles TYPE OF EQUIPMENT: Clamshell SMALL BUSINESS SET ASIDE: No LAST DREDGED: 2000 - 2005 ENVIRONMENTAL WINDOW: Dec 1 – July 31, Sep 1 – Mar 31 REASON FOR WINDOW: Sturgeon, Dredged Material Drying FY 07 FUNDING: $18,500,000 ADVERTISING DATE: Jun 30, 2006 BID OPENING DATE: Aug 1, 2006 AWARD DATE: Aug 23, 2006 CONTRACT AMOUNT: $18,834,200 CONTRACTOR: Great Lakes Dredge & Dock Co.

  20. PROJECT: Baltimore Harbor & Channels, MD TYPE WORK: Maintenance DEPTH: 50 Feet WIDTH: 400 - 800 Feet LENGTH: 10 – 15 Miles QUANTITY: 2,500,000 cy TYPE OF MATERIAL: Silt and clay PLACEMENT AREAS: Poplar Island and Hart-Miller Island DIST. TO PLACE. AREA: 20 -30 Miles TYPE OF EQUIPMENT: Clamshell SMALL BUSINESS SET ASIDE: No LAST DREDGED: 2000 - 2006 ENVIRONMENTAL WINDOW: Dec 1 – July 31, Sep 1 – Mar 31 REASON FOR WINDOW: Sturgeon, Dredged Material Drying FY 07 FUNDING: $300,000 ADVERTISING DATE: May 2007 BID OPENING DATE: Jun 2007 AWARD DATE: Jun 2007

  21. Existing Dredged Material Placement Sites

  22. HART-MILLER ISLAND CONTAINMENT FACILITY

  23. Poplar Island Environmental Restoration Project

  24. Proposed Masonville DMCF Seagirt Marine Terminal Port of Baltimore

  25. Seagirt Marine Terminal

  26. Masonville Dredged Material Containment Facility

  27. FY06 FY07 FY08 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Scheduled FY06 Dredging Work in Baltimore District Corps Dredge Currituck Assateague Island 90 KCY 90 KCY 90 KCY Page 1 of 1

  28. Assateague Island Restoration

  29. Ocean City Inlet Looking West

  30. Assateague Island, Looking North

  31. USACE Dredge CURRITUCK Depositing Sand in Surf Zone Off Assateague Island

  32. Maryland Port Administration’s Seagirt Marine Terminal

More Related