1 / 3

Strategic Evaluation of Country Programming (2010)

Strategic Evaluation of Country Programming (2010). CPF is a building block of the Country Programming, which is based on three elements: Priority setting at the country level; Country Programming framework Country Work plan

demont
Download Presentation

Strategic Evaluation of Country Programming (2010)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Evaluation of Country Programming (2010) • CPF is a building block of the Country Programming, which is based on three elements: • Priority setting at the country level; • Country Programming framework • Country Work plan • Country Programming is an institutional process that is fully integrated with the corporate planning, programming and accountability system (Rec. 2). • CPF should include expected outcomes at the greatest level of detail possible or the most appropriate level of detail reflecting the consensus among Government, UNCT and other partners (Rec. 11). It should also include resource requirements (Rec. 12) • CWP will include the unit results planned under the NMTPF/CPF • CPF has programmatic relationships with the CWP, which should be defined in the Corporate Country Programming Guidelines

  2. BEFORE EVALUATION NMTPF isolated from Corporate Planning Many FAO planning frameworks Voluntary approach NMTPF is a country office product Priority setting tool Multiple accountability and reporting Implications and Challenges for the New Generation of CPFs AFTER EVALUATION • CPF fully integrated in Corporate Planning • One country programme • Prerequisite for funds allocation • CPF is a corporate product • Results oriented planning tool • One accountability and reporting

  3. CPF Cycle Challenge 2: Linking CPF to CWP and SF Challenge 1: Priority setting and C.A

More Related