An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Edison Site Expansion Community Meeting June 17th 2019

  2. Construction Operations (AGENDA) • Community Liaison • Construction Hauling Route Plan • Construction Parking & Site Logistics • Temporary Pedestrian and Vehicular Circulation • Temporary Lighting Plan • Hours & Overall Schedule for Construction

  3. Construction Liaison • Joe Arnold, Project Executive • Mobile: 703-853-7354 • Email: joe.arnold@skanska.com • Quarterly Meetings • First Tuesday of Each Quarter • 7p at VHC Hazel Auditorium • Utilize Skanska App

  4. VHC Liaison • Adrian Stanton, Vice President • phone: 703-558-6319 • Email: Astanton@virginiahospitalcentor.com

  5. Construction Hauling Route Plan • All access originates from Lee Highway and N. George Mason • FROM POINTS NORTH AND WEST • Beltway Exit 66 to Route 7 • FROM POINTS EAST AND SOUTH • I-395 at Glebe Road, North to Lee Highway • NO ACCESS from I-66 or Washington Blvd.

  6. Construction Parking & Site Logistics • Onsite parking reserved for project supervision • Public transportation from BALLSTON or EAST FALLS CHURCH • Utilization of offsite parking in other private lots w/shuttles • Peak manpower during last 15 months of project—utilize new garage • NO STREET PARKING

  7. Temporary Pedestrian and Vehicular Circulation • 7-Day notice required • 1-Lane open at all times (Edison & 19th Street Utilities) • Flagman & traffic control during construction hours • Jersey barrier, plates, etc. • Sidewalks open opposites sides of N. Edison, 19th Street and N. George Mason as required • Approved MOT plan on file and available

  8. Temporary Lighting Plan No Changes Required

  9. Construction Work Hours and Duration • Overall duration is 36 months • Bldg Demolition – Q3 2019 • Site Excavation - Q1 2020 • Garage Complete – Q2-2021 • Pavilion Complete – Q4-2022 • Work hours generally will be from 7a-4p, M-F • Workers will arrive between 6a-7a, and depart at 4p • Generally no work on weekends unless required by schedule • 9a-9p as per site conditions • Will provide notice

  10. Contact Information • VHC EMAIL: VHCLiaison@virginiahospitalcenter.com • VHC HOTLINE: 703-558-5994 • VHC Project Website: • https://www.virginiahospitalcenter.com/patients/new_pavilion.aspx