Group Meeting01/29/2008 Sidong Zeng
Follow up with the network problems and installation in NBEL. (Done) • Requested the NEC wireless network improvement. (Done) • Updated the NBEL website. (Done) • FTIR server machine installation. (Done) • Analysis Genset test data. • C programming
Future Works • Analysis the Genset test data. • Labview • Follow up the lab Server