2q 2011 haz mat ops rto n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
2Q 2011 Haz Mat Ops RTO PowerPoint Presentation
Download Presentation
2Q 2011 Haz Mat Ops RTO

Loading in 2 Seconds...

play fullscreen
1 / 23

2Q 2011 Haz Mat Ops RTO - PowerPoint PPT Presentation


  • 70 Views
  • Uploaded on

2Q 2011 Haz Mat Ops RTO. HM76 Orientation. SAFETY. Leave at least an engines length on each side. Leave at least an engines length to the rear. If you know the incident is going to expand try to reserve a large space uphill, upwind, upstream for HM76. It will become our base of operations.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '2Q 2011 Haz Mat Ops RTO' - davis


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
2q 2011 haz mat ops rto

2Q 2011 Haz Mat Ops RTO

HM76 Orientation

clearances

Leave at least an engines length on each side.

Leave at least an engines length to the rear.

If you know the incident is going to expand try to reserve a large space uphill, upwind, upstream for HM76. It will become our base of operations.

Clearances
ramp safety

Ramp is large and heavy.

It should only be operated by a Haz Mat Tech with training and experience operating the ramp.

Take all direction from operator if detailed to operate off the back ramp.

Ramp Safety
entry team support1
ENTRY TEAM SUPPORT

Suits and boots.

Located interior drivers side.

entry team support2
ENTRY TEAM SUPPORT

SCBA, helmets and radios.

Located on drivers side Comp#6.

decon carts
DECON CARTS

Two red carts on officers side of the trailer.

Clipboard shows layout.

Be careful to unhook hinge in front prior to moving.

entry team support3
ENTRY TEAM SUPPORT

Equipment for pre and post entry vitals.

Located on officers side Comp#7.

entry team support4
ENTRY TEAM SUPPORT

Spare 1-hour bottles.

Located on officers side Comp#5.

entry team support5
ENTRY TEAM SUPPORT

Stools for Entry Team.

Located on officers side Comp#3.

entry team support6
ENTRY TEAM SUPPORT

Fridge for water and cooling vests.

Key is hanging from shelving.

Located on officers side front of trailer as you enter.

spill response supplies
SPILL RESPONSE SUPPLIES

Large brooms and scoop shovels.

Located on officers side Comp#3.

spill response supplies1
SPILL RESPONSE SUPPLIES

Absorbent pads and Zimmerlite.

Zimmerlite bins fit into visible carts. (need to operate lift to access)

Located in rear of trailer.

slide17
RIT

Located on end of suits and boots shelf.

slide19
LAB

Entry to the lab. Haz mat techs only.

Located at front of trailer.

pass through
PASS THROUGH

Located on officers side front of trailer.

misc support supplies
MISC SUPPORT SUPPLIES

J boxes. (can only be attached to HM76)

Located on officers side Comp#7.

misc support supplies1
MISC SUPPORT SUPPLIES

J box attachments.

Located on all 4 corners of trailer.