1 / 7

DAPNIA Site report

DAPNIA Site report. What’s new in Saclay. CARIOCAS project COASTAL project DAPNIA HPC GRIF (Saclay) Windows news. CARIOCAS project. First step of the project accepted : the network is working : We can “see” Bruyères le Chatel … All the machines installed on the Saclay side :

davidperez
Download Presentation

DAPNIA Site report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DAPNIA Site report

  2. What’s new in Saclay • CARIOCAS project • COASTAL project • DAPNIA HPC • GRIF (Saclay) • Windows news

  3. CARIOCAS project • First step of the project accepted : the network is working : • We can “see” Bruyères le Chatel … • All the machines installed on the Saclay side : • 25 computing nodes with gigabit ethernet • 5 computing nodes with a 10 gigabits (fiber) ethernet card • 1 Lustre MDS server (HP with 4 SAS disks of 146 GB) • 12 Lustre OST servers (HP with 6TB SATA disks each) • 1 Extrem network switch (model 8810)

  4. COAST project • Main goal of the project COAST (COmputational ASTrophysics) : • Development of new algorithms • Use of parallel centralized computers : • CCRT (Centre de Calcul Recherche et Technologies) • TERA 10 • Post-treatment on the DAPNIA HPC cluster • Visualization of the data and development of the software (SDvision)

  5. DAPNIA HPC • New facility for searchers in Cosmology, Astrophysics and Accelerators : • IBM cluster : • 24 computing nodes (bi opteron 2.6 GHz with 2 GB memory) with infinipath cards • 1 server node (IBM) • 1 Voltaire Infiniband switch

  6. GRIF Saclay • Decommissioning of old Dell worker nodes, • Third DPM disk server in production (+6 TB), • Use of the 25 HP nodes of CARIOCAS as Worker Nodes (double the computing resources), • 2nd 3Com 5500 switch in production (to connect the CARIOCAS nodes to the GRIF network • Extrem network switch as future heart of the Saclay GRIF network not yet installed • Next upgrade (beginning of December) 90 terabytes more : • 5 HP DL 385G2 with 2 P800 cards • 10 HP MSA with 12 disks (750 GB) in each cabinet

  7. Windows • Working group on Office : Use of OpenOffice instead of Office 2007 • XP or Vista : The machines are all reinstalled in Windows XP. No Vista deployment foreseen in the near future …

More Related