1 / 12

A.BD.CZ Association of Czech airtightness test providers

A.BD.CZ Association of Czech airtightness test providers. Jiří Novák Czech Technical University, Prague. situation. 2009: approx. 5 airtightness test providers in CZ launch of state subsidies for construction of passive houses.

darren
Download Presentation

A.BD.CZ Association of Czech airtightness test providers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A.BD.CZ Association of Czech airtightness test providers Jiří Novák Czech Technical University, Prague

  2. situation • 2009: approx. 5 airtightness test providers in CZ • launch of state subsidies for construction of passive houses • new construction – financial support bound up with a succesfull airtighnes test • expected rise of the number of test providers • need of quality control Jiří Novák | April2011

  3. foundation of A.BD.CZ • July 2009: Asociace Blower Door CZ founded (A.BD.CZ) www.asociaceblowerdoor.cz July2010 “a voluntary, non-political, professional association of persons performing the measurements of building airtightness by means of the fan pressurization method or derived methods and promoting a complex quality of buildings, particularly the reduction of energy consumption due to the limitation of their air permeability” Jiří Novák | April2011

  4. goals of A.BD.CZ • supervision and quality control of the professional activities of the members • support of knowledge exchange and lifelong learning of the members • development of measuring procedures and their implementation • cooperation with state authorities Jiří Novák | April2011

  5. members of A.BD.CZ • 35 members • 19 mesuring devices • membership open to every active airtightness test provider • observation of ethical code required • violations of ethical code – disciplinary procedure Jiří Novák | April2011

  6. foregoing activities • common protocol of test results for the purpose of Green Savings programme (subsidies for PH) • definition of general conditions of the test (state of the building at the moment of the test) Jiří Novák | April2011

  7. ongoing activities • general meetings with workshops • round-robin tests (2010, 2012) • collection of test results • development and analysis of a leakage database Jiří Novák | April2011

  8. planned activities • certification of members • commentary of EN 13829 (common interpretation) Jiří Novák | April2011

  9. EU network - motivation / expectations • motivation • need of information exchange (learning from good examples, successful approaches...) • contribute, support this information exchange Jiří Novák | April2011

  10. EU network - motivation / expectations • motivation • need of information exchange (learning from good examples, successful approaches...) • contribute, support this information exchange • expectations (role of the EU network) • gathering the information about the approaches adopted in different countries to deal with selected issues („summary tables“) • gathering detailed information concerning main issues (conference / workshop papers, leakage data...) • facilitate a homogenous testing practice - common approaches or guidelines (e.g. structure of test protocol, of a lekage database training...,) Jiří Novák | April2011

  11. we can offer... • experience with: • round-robin tests • development and analysis of a leakage database • implementation of EN 13829 • developpment of a common test protocol Jiří Novák | April2011

  12. thank you...

More Related