1 / 16

Planning Routing Services

Creating an Implementation Plan and Documenting the Implementation. Planning Routing Services. Implementing Routing in the Network. Ad-hoc approach Identify the need for the implementation Implement routing in the network Structured approach Create an implementation plan

danil
Download Presentation

Planning Routing Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Creating an Implementation Plan and Documenting the Implementation Planning Routing Services

  2. Implementing Routing in the Network • Ad-hoc approach • Identify the need for the implementation • Implement routing in the network • Structured approach • Create an implementation plan • Implement the solution • Document the implementation

  3. Structured Approach • Well-known models and methodologies that can aid in structuring the network implementation tasks include the following: • Cisco Lifecycle Services (PPDIOO) • IT Infrastructure Library (ITIL) • Fault, Configuration, Accounting, Performance, and Security (FCAPS) • Telecommunications Management Network (TMN) • Choose a model with elements that fit your organization as well as its business and technical needs.

  4. Models and Tools • Select the implementation model • Adapt the model to your organization’s needs • Select the tools supporting the model • Create the implementation plan

  5. Create the Implementation Plan • Identify the required information for the plan: • Network-specific information, activities, and tasks • Dependencies of the existing installation • Recommended resources • Create the implementation plan • Implement the solution • Verify the implementation • Create the documentation

  6. Identify the Required Network Information • Existing topology, equipment, and software version • IP addressing plan • Scalability configuration (summarization, stub areas, and so on) • List of advertized networks • Link utilization • Metric requirements for primary and backup links

  7. Identify Other Requirements • Site specific implementation requirements • Dependencies on existing installation • Configuration and verification commands • Implementation schedule and resources • Tools Online Resources

  8. Create the Implementation Plan • Plan the work tasks • Select the site-specific tools and configurations • Configure and coordinate work with specialists • Create verification tests

  9. Implementation Plan Documentation • Good documentation is a result of good processes and procedures. • Documentation must be: • Correct • Up-to-date • Accessible • Documentation must support: • Future upgrades and changes • Troubleshooting • Reporting

  10. What to Document? • Network information • Tools • Resources • Implementation plan tasks • Verification tasks • Performance measurement and results • Screenshots and photos

  11. Example: Implementation Plan • Identify the existing situation and requirements • Follow these steps to create an implementation plan: • Plan • Select the tools and resources • Coordinate the work with specialists • Verify • Interpret the performance results • Document the baseline, performance, and recommendation

  12. Enterprise Network Topology Required

  13. Identify Network Information and Requirements • Existing topology, equipment, and software version • IP addressing plan, configuration, and link utilization • Requirements for: • Connectivity and configuration • Protection and optimization • Security and remote access

  14. Creation of the Implementation Plan • Create an implementation plan and document it • Project contact list • Location information • Tasks and detailed descriptions • Verification steps • Representation of the results

  15. Summary • Using well known models and methodologies can aid in structuring the network implementation tasks and creating an implementation plan. • An implementation plan consists of the project and network overview, required tools, and information, as well as the implementation tasks. • The tasks in the implementation plan provide a detailed explanation of all actions that must be taken in order to configure the network according to requirements. • Good documentation is a result of good processes and procedures, and includes performance testing and documentation of results.

More Related