An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Our Approach to System Engineering and Our Major Issues Dan Farris Titan

  2. Customer Requirements • Operate a GOCO for depot support • AF Customer changed from Integrated Logistics Support to Systems Engineering model • ISC2 Contract TSPR like • ESC required use of RTM • ESC now requires CMMI Level 3 for contractors and major subs

  3. Organization • System Engineering • Systems Engineering & Architecture Section • Engineering • Computer/Network/Software • CADD • System Technical Support • Project Control • Test and Evaluation • System Support • PDM • Tech Shop • Business Support

  4. History • Bottoms Up Approach (2000) • Original efforts around EIA 731 • Level One and declining • Top down only with ESC mandate (2004)

  5. Challenges • Management luke warm to systems engineering • Resources, including time, not provided • Cash flow crunch eliminated Systems Engineering & Architecture Section • CMMI Level 3 under discussion now • Systems Engineers transferred to different group

  6. Accomplishments • Developed Requirements Management Function • Developed Trade Study standard process • Began linking systems engineering with project management • Began requirements gathering at project beginning • Began linking requirements to testing

  7. Disappointments • Lack of desire to work towards CMM principles