This report discusses the testing of short and long kicker modules using the noker CX1168 Thyratron system. Preliminary findings reveal that two short modules, while similar in characteristics, did not meet expectations. Efforts are underway to modify the short kicker in progress to develop a third module. Additionally, there is an observed time difference of 8-15 ns between the ANU pulser and the operational booster pulser, indicating a slower performance. Testing continues on the Long BKED012 and Short BKEE002 magnets.
E N D
Testing short & Long Kicker modules using noker CX1168 Thyratron system • Two short modules look similar in characteristic but not as expected. • Short Kicker rebuild in progress to make to get third module with modifications. Booster Short Kicker TestingUpdate
Preliminary Finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower)