DuPont Design for Reliability Tactical Approach to Front End Loading

DuPont Design for Reliability Tactical Approach to Front End Loading. Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston, TX. Agenda. Differentiating between Quality and Reliability Value Proposition “Live” Case Study

Download Presentation

DuPont Design for Reliability Tactical Approach to Front End Loading

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston, TX

  2. Agenda • Differentiating between Quality and Reliability • Value Proposition • “Live” Case Study • DF “X”: Front End Loading Tactical Approach

  3. Distinction Between Reliability and Quality • Quality assures that the production line will work after assembly and as designed. • Reliability provides the probability that the production line will perform its intended function for a designated period of time without failure under specified conditions. • Reliability looks at how long the equipment will work as designed, which is a very different objective than that of traditional quality control. • Different tools and models apply to reliability that do not necessarily apply to quality and vice versa.

  4. Reliability vs. Initial Cost What is your Experience of what the shape of this curve would look like?

  5. Reliability vs. Initial Cost Here is an example – What elements will effect its shape and slope

  6. Maintainability vs. Initial Cost What is your Experience or “Gut Feel” of what the shape of this curve

  7. Maintainability vs. Initial Cost Here is an example – What would effect the shape and slope of this curve?

  8. Life Cycle Cost vs. Initial Cost What is your Experience or “Gut Feel” of what the shape of this curve

  9. Life Cycle Cost vs. Initial Cost Here is an example – What elements would effect the shape and slope of this curve?

  10. Front End Loading • FEL 1 • Determine the desired Maintenance Culture and Preliminary Maintenance Strategies • Add a Maintenance Team Leader to the Project Team and Assign a Reliability Engineer too • Include specific and realistic Reliability Goals in the Project Objectives • Model the Preliminary design to determine equipment availability – Reliability Requirements & Possibilities

  11. Front End Loading • FEL 2 • Add Reliability enhancing design elements into Project Design and Equipment Selection • Assure that Maintainability is a significant consideration in the design process • Develop the Maintenance Plan for the Equipment • Upgrade the Model with the more complete design information – use results to guide refinements to design

  12. Front End Loading • FEL 3 • Develop a Maintenance Materials Strategy • Increase Maintenance Craft Specialist involvement in review and analysis of designs and equipment selection to assure Maintainability and Reliability • Determine Maintenance Training needs • Start Building the Equipment and Parts Master Data • Develop the Bills of Material

  13. Questions