Primavera PERT Master – The Risk Analysis Tool

Primavera PERT Master – The Risk Analysis Tool. Presentation Agenda. What is PERT Master ? Project Risk Management Concepts Introductory Demonstrations Importing from Primavera Quick Risk Templates Running a Risk Analysis Risk Register with schedule Advanced Risk Management

damien
Download Presentation

Primavera PERT Master – The Risk Analysis Tool

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Primavera PERT Master – The Risk Analysis Tool

  2. Presentation Agenda • What is PERT Master ? • Project Risk Management Concepts • Introductory Demonstrations • Importing from Primavera • Quick Risk Templates • Running a Risk Analysis • Risk Register with schedule • Advanced Risk Management • Schedule cost loading techniques • Probabilistic cash flow and profitability breakeven

  3. What is PERT Master ? Maximize Profit • PERT Master Focus • Specialist in Project Risk Management • Full Lifecycle risk solution • Faithful to project scheduling • PERT Master Vision • “Improved decision making through project intelligence” Management Reserve “Strategic Decisions” Mitigation Cost/Effort “Maximize Return” Total Project Cost Contingency “Proper Allocation” Budget / Schedule Estimate “Minimize Uncertainty”

  4. Life Value Proposition PHASE 2 PHASE 3 S A N C T I O N PHASE 4 PHASE 1 PHASE 5 Opportunity(e.g. oil field) Alternative selection (rig A/B/C, own) FEEDFront End Engineering Design Execution Detailed Eng. & Procurement Operations Detailed Eng. & Procurement Wild Guess (WAG) -15% to +30% Estimate +/-10% Estimate +/- 3% Estimate No Estimate Uncertainty • High estimate uncertainty • Little Known about risk events • Estimate uncertainty – Low • Discrete risk events Capital Investment risk analysis Schedule based cost risk analysis Risk event / register analysis Risk event monitoring Market/Investment risk analysis “DOING RIGHT PROJECTS” “DOING PROJECTS RIGHT” PLAN YOUR WORK WORK YOUR PLAN

  5. Life Value Proposition CORPORATE REVENUE ANALYSIS PORTFOLIO ANALYSIS PROJECT ANALYSIS PHASE 2 PHASE 3 S A N C T I O N PHASE 4 PHASE 1 PHASE 5 Opportunity(e.g. oil field) Alternative selection (rig A/B/C, own) FEEDFront End Engineering Design Execution Detailed Eng. & Procurement Operations Detailed Eng. & Procurement WAG -15% to +30% Estimate +/-10% Estimate +/- 3% Estimate No Estimate Uncertainty • High estimate uncertainty • Little Known about risk events • Estimate uncertainty – Low • Discrete risk events Capital Investment risk analysis Schedule based cost risk analysis Risk event / register analysis Risk event monitoring Market/Investment risk analysis “DOING RIGHT PROJECTS” “DOING PROJECTS RIGHT” PLAN YOUR WORK WORK YOUR PLAN

  6. Risk Vs Schedule • Realistic /Most Likely • Aggressive / Optimistic • Cautious / Pessimistic • Scale to Fit

  7. Types of Risks • Uncertainty • PERT Master handles uncertainty by using three point estimate distributions minimum, most likely and maximum • Risk Events • PERT Master handles risk events by using risk register to enter possible events along with estimates of each one’s probability and potential impacts on duration, cost and project quality Uncertainty + Risk Events = Total Risk Exposure

  8. Types of Risk - Uncertainty Duration/Cost E.g. How long does it take to do wiring?

  9. Types of Risk Activity A E.g. Do we need to replace old wiring? ? Activity B Activity C

  10. Branching – Probabilistic & Conditional Scenario: Renovate the Premises • Remove wiring (50% probability) • Repair wiring (40% probability) • Install new wiring (10% probability)

  11. Template Quick Risk

  12. Types Of Risks - Risk Events • Single Impact • Series of Impact • Multiple exclusive impacts • Multiple impacts to multiple activities

  13. Risk Register

  14. Risk Register

  15. Monte Carlo Simulation • Range forms an envelope • One segment is selected for each envelope • Hidden critical paths revealed 7 8 9 10 11 12 13 14 15 16 17 Min Likely Max

  16. Monte Carlo Simulation ITERATION 1 • Range forms an envelope • One segment is selected for each envelope • Hidden critical paths revealed 10 DAYS 2 9 DAYS 3 14 DAYS 4 17 DAYS 5 11 DAYS 6 7 DAYS 7 10 DAYS 8 12 DAYS 9 6 DAYS 7 8 9 10 11 12 13 14 15 16 17 … Min Likely Max

  17. PERT Master Risk Analysis Methodology • Risk Ready State • Schedule : Sound logic • Scheduling errors • Risk Inputs • Estimate Uncertainty: “Quick Risk” • Risk Events: risk register • Risk Impacts • Map risks to tasks • Risk Analysis • Monte Carlo Simulation • Risk hot spots

  18. PERT Master Risk Analysis Methodology • Risk Response • Determination of Contingency • Mitigation Scenarios • Probabilistic cashflow

  19. Plan Validation: Schedule Check

  20. Initial Risk Inputs – Quick Risk Analysis

  21. Accuracy with Ease

  22. Risk Outputs