1 / 1

APBC Working Group Summary Report

APBC Working Group Summary Report Campus Master Plan [CMP]: Innovation Park – Integrated Research Complex [IP-IRC] Summary Points

dai
Download Presentation

APBC Working Group Summary Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APBC Working Group Summary Report • Campus Master Plan [CMP]: Innovation Park – Integrated Research Complex [IP-IRC] • Summary Points • The IP – IRC facility is a specialized research and advanced instructional facility, targeted for use in transferring research into commercial activity, primarily in CEAS and CHS’s areas of excellence in bio-engineering, energy, transportation, and informatics. • Plans outline a facility housing upward of 80 FTE faculty and staff in a four-level, multi-structure complex with nearly 140,000 assignable (usable) square feet completed in two or more construction phases. • The IP industrial development facet of the overall plan has broad support involving both campus and community constituencies. • Part of the proposed UWM IRC is potentially fundable as a base facility for the IP plan as evidenced by a $30MM federal economic development grant under consideration. • The HGA plan appears highly responsive to UWM faculty needs and values.

More Related