Study the physics reach and performance of the BESIII detector, including topics such as D physics, leptonic and semileptonic decays, D-Dbar mixing, and more. Explore optimization of detector components and simulations for improved resolution and PID.
E N D
More design Works • More simulation to study the physics reaches with BESIII. magnet? solid angle coverage ? Identify several important physics topics, and study • the physics performances. • D physics, leptonic, semileptonic, D-Dbar mixing • What is the luminosity needed after CLEOc, • 1 10 to 33 or > 3 10 to 33 • Some physics topics demand high mom. Resolution and very good PID
More study about IR, the backgrounds and mask design. • More detector simulation to arrive design optimization • - TOF time resolution, the z position error from track extrapolation? • - the low limit of photon detection? • Each system (detector components, DAQ and electronics) needs R&D, prototypes • Commissioning machine with detector outside beam line, radiation issue.
Major issues related with BESIII design • The radius of crystal calorimeter, affecting performances and cost. Possibility of using CsI crystals as EMC. • Personally, CsI is fine, except radius problem, if we use existing magnet (CLEO I) • Backgrounds associated with machine operation, the design of interaction regions, vacuum, masks, etc. Experienced man power big issue
Subsystem BES III CLEOc Vertex MDC XY (m) = 130 90 P/P (0/0) = 0.8 % 0.5% dE/dx (0/0) = 7 % 6 % BEMC E/√E(0/0) = 2.5-3 % 2.0% z(cm) = 0.3 cm/√E 0.3 cm /√E TOF T (ps) = 65 ps? RICH m counter 12 layers(?) 3 layers Magnet 1.2 tesla 1.2 tesla
Competition from CLEOC Serious challenge from CLEOC project Design machine and detector to be as advanced as possible, Complete the BEPCII/BESIII project ASAP Collaboration between BES and CLEO • Fit with BEPCII lattice, space? 1.8 m from IP to SCQ • Schedule, commitment of detector moving? • - Physics collaboration?
BESIII Collaboration Welcome international collaboration, and domestic collaboration, groups to participate in BESIII project Design, MC simulation, decision making process for making Final decision, Sub-detectors R&D and construction Electronics R&D and manufacture Online/Offline software, more flexible arrangement Software package Reconstructions and Calibration code Physics study In charge of some sub-system or send people to IHEP
about Cost and schedule • Cost for EMC, SC magnet and electronics is most crucial; • MDC, EMC and SC magnet (including iron structure) on critical path. • Man power issues • Serious man power shortage exists, especially the experienced people.
Cost estimation of Detector subsystem (Preliminary) • In M RMB (1 USD= 8.3 RMB) • Beam pipe + vertex chamber 3.0 • MDC 11.0 • TOF 6.0 • Barrel EMC 54.0 • Endcap EMC 20.0 • Barrel Muon detector 4.5 • Endcap Muon detector 2.5 • Super conducting magnet 45.0? • Luminosity 2.0 • Electronics 63.0? • Trigger and DAQ 13.0 • Total224.0 • about 1/4 to 1/3 of the detector budget either be contributed other sources • or be staged.
Schedule • Feasibility Study Report of BEPC II has been submitted to the funding agency . • Technical Design Report of BEPC II to be submitted by first half of 2002. • Construction started from Summer of 2002 • BESII detector moved away Summer of 2004, and the BESIII iron yoke started to be assembled, mapping magnet early 2005 • Preliminary date of the machine long shutdown for installation : Spring of 2005 • Tuning of Machine : Beginning of 2006 • BESIII detector moved to beam line, May2006 • Machine-detector tuning, test run at end of 2006
Major Upgrades in BESIII • Superconducting magnet • Calorimeter: BGO with E/E ~ 2.5 % @ 1GeV • MDC IV: with small cell, Al wires and He gas • Vertex detector: Scintillation fibers for trigger • Time-of-flight : T ~ 65 ps • Muon detector • New trigger and DAQ system • New readout electronics
Scintillating fiber for Trigger 1.27 mm or thinner Be beam pipe may be used • R ~ 3.5 cm • 2 double-layers: one axis layer and one stereo layer • Scintillating fiber: 0.3*0.3 mm2, L~60 cm • Clear fibers: 0.3*0.3 mm2, L~1.4 m • two side readout by APD (Φ3) (below –300) • Signal/noise: <6 p.e.> / <~1p.e.> • ~ 50 m z~ 1mm • Total # of channels: 27 x 8 = 216
Main Draft Chamber • End-plates with stepped shape to provide space for SC quards and reduce background • Inner part: stepped conical shape, cos θ= 0.93 • Outer part: L = 190 cm, cosθ= 0.83 with full tracking volume • cell size: ~ 1.4 cm x 1.4 cm • Number of layers (cell in R): 36 • Gas: He:C2H6 , or He:C3H8 • Sense wire: 30 m gold-plated W , • Field wire: 110 m gold-plated Al • Single wire resolution : 130 m • Mom. resolution : 0.8 % @ 1GeV &1T, 0.67% @1GeV&1.2T • DE/dx resolution: 7%
Trackerr simulation of MDC, pt as a function of pt in % for pion, wire resolution 130 m
Trackerr simulation of MDC, pt as a function of pt in % for pion, wire resolution 100 m
PID: Time of Flight Counters • Double layers TOF: ( or TOF +CCT) plastic scintillator (BC-404) • 80 pieces per layer in • R: 66 ~ 75 cm, • Thickness 4 cm, length ~ 190 cm • Readout both sides by F-PMT • Time Resolution ~ 65 ps 2σon k/ separation: 1.1~1.5GeV/c (for polar angle 00~ 450) • For CCT option, need R&D
BGO Barrel Calorimeter To provide minimum space for main draft chamber and TOF and to obtain the necessary solid angle, one must modify L3 BGO crystals, and add new crystals • 13 X0: E/E ~ 2.5 % @ 1GeV • Rin ~ 75cm , Lin ~ 200cm cos = 0.83 • Cut L3 BGO crystals (10752) 22 X0 (24cm) into 13X0 (14cm) + 8.5 X0(9.5cm) • Making new bars of 14 cm by gluing 9.5cm + new crystal of 4.5cm • new BGO crystals needed.
Endcap Detector • Two possible technologies can be used, • CsI crystals as in the detector figure, similar technology as in the barrel, need endcap TOF. • 2.Similar technique as KLOE using lead-fiber • technique, may not need TOF counters. • The first choice is preferred.
Superconducting Magnet for BESIII • B: 1 ~ 1.2 T, • L ~ 3.2 m • Rin~ 105 cm, Rout ~ 145 cm Technically quite demanding for IHEP,no experience before, need collaboration from abroad and other institutes in China, both for coil and cryogenic system.
Muon Counter • Barrel (L ~ 3.6m ) + Endcap: cos ~ 0.9 • Consist of ~ 12 layers stream tube or RPC • Rin ~ 145cm (yoke thickness ~40cm) • Iron plate thickness: 2-6 cm • counter thickness: ~1.5 cm • Readout hits on strips ~3cm • total weight of iron: ~400 tons
Muon acceptance Pion contamination
Interaction Region • It is very compact at IR, very close cooperation is needed in the designs of detector and machine components at IR • Understand the space sharing, the support, vacuum tight • Understand the backgrounds from machine and how to reduce them, • - Beam loss calculation (masks) • - Synchrotron radiation (masks) • - Heating effect (cooling if necessary) • Understand the effects of thefringefield from SCQ to the detector performances
Luminosity Monitor • Because the situation at the IR, the luminosity has to either • be located quite far away from the IR (3-5m), or in front of • Machine Q magnet, to be designed carefully. • Accurate position determination; • Multiple detection elements at each side to reduce the • variation of luminosity when the beam position shifted • BGO crystals ?
Trigger • Trigger rate estimation (using the same trigger conditions as now) • Background rate, with 40 times beam current and half of the beam lifetime, the rough estimation for the background is80 times the current rate (10-15), or 800-1200 Hz, taking 1500 as a design number • Good event rate When leave room for maximum luminosity to be as calculated, 11033, 200 times as current event rate, to be 1500 Hz • Cosmic ray background can almost be negligible Total peak trigger rate can be more than 3000 Hz, additional trigger (software) is needed to reduce the event rate to 2000Hz.
Level 0 and 1 are hardware triggers, latency 2.4s, Level2 is software filtering using online computing farm Because fastest detector element TOF need a time window of about 30 ns, the trigger can identify bunch train only, not individual bunch • Level 0 with TOF signals • Level 1 with hardware track finding, EMC clustering, total EMC energy, VC tracking or hits, counter hits
Front-end Electronics • Pipeline scheme is required • Requirements • For the timing measurement • 25 ps for TOF, 0.5 ns for MDC • For charge measurement • 1% accuracy for EMC, 2% for MDC and TOF • Total number of electronic channels ~ 76800 (too many muon channels?)
Data Acquisition System Event builder 3000 Hz 6 K bytes ~ 20 Mb/s Event filtering Data storage Run control Online event monitor Slow control Switch network
Offline Computing and Analyses Software • Computing, network, data storage, data base, processing management • Supporting software package, data offline calibration, event reconstruction, event generators, detector simulation Total CPU 36000 MIPS Data storage 500 Tbytes/y on tapes, 24 Tbytes/y on disks Bandwidth for data transfer 100 Mbps Substantial manpower needed for software
Major New Subsystems of BESIII • Vertex chamber ZHANG Qinjian • Main drift chamber CHEN Yuanbo • Time of flight counter HENG Yuekun • EMC shower counter LU Jungguang • Luminosity monitor WU Jian(USTC) • Trigger system LIU Zhenan • Front-end electronics SHENG Huiyi, ZHAO, Jingwei • Data Acquisition HE Kanglin • Computing and software MAO Zepu
Detector R&D • A lot of new detector technology • R&D for most sub-systems started • Detector optimization is needed • Modify the detector design when international collaboration is formed, new ideas are mostly welcome
Cost Estimation • Detector: ~ 220M Chinese Yuan ( ~ 30 M US$ ) • 2/3 to 3/4 are from Chinese Government • International collaboration and contribution are needed
Intl. Cooperation on BEPC II / BES III • Intl. cooperation played key role in design, construction and running of BEPC/BES. • Intl. cooperation will play key role again in BEPC II / BES III: design, review, key technology, installation, tuning …… • Participation of foreign groups is mostly welcomed. BESIII should be an international collaboration, Establish organization accordingly.
Summary • BEPC energy region is rich of physics, a lot of important physics results are expected to be produced from BESIII at BEPCII • Detector design is started, need a lot of detailed work to finish detector design • Very interesting and very challenging project Thanks