slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
2009 WSDOT/ACEC Structures Team Status Report PowerPoint Presentation
Download Presentation
2009 WSDOT/ACEC Structures Team Status Report

Loading in 2 Seconds...

play fullscreen
1 / 8

2009 WSDOT/ACEC Structures Team Status Report - PowerPoint PPT Presentation


  • 136 Views
  • Uploaded on

2009 WSDOT/ACEC Structures Team Status Report. Geoff Swett - WSDOT Jim Schettler – Jacobs Engineering June 1, 2011. Geoff Swett – SE Co-Chair - Bridge Design Office Eric Schultz – PE Bridge Design Office Jesse Beaver – PE HQ - Bridge Construction Scott Sargent – PE Bridge Design Office

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '2009 WSDOT/ACEC Structures Team Status Report' - crevan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

2009 WSDOT/ACEC Structures Team Status Report

Geoff Swett - WSDOT

Jim Schettler – Jacobs Engineering

June 1, 2011

structures team 2010 2011
Geoff Swett – SE Co-Chair - Bridge Design Office

Eric Schultz – PEBridge Design Office

Jesse Beaver – PEHQ - Bridge Construction

Scott Sargent – PEBridge Design Office

Jeri Bernstein - PE Washington State Ferries

No WSDOT members rotated off the team

Jim Schettler - SECo-Chair - Jacobs Engineering

Paul Guenther - SECH2M Hill

Bill Elkey- SEParsons

Richard Patterson- SEAECOM

Chester Werts- SEHDR

Jake Menard- SEDEA

4 Consultant members rotated off the team

ACEC

Structures Team – 2010-2011
  • Jerry Lenzi Team Sponsor – Engineering Programs Director
  • Dave PetersTeam Sponsor – HDR
who are we
Who are we?
  • Team Purpose:
    • Address issues within bridge and structural engineering related to project delivery
    • Strengthen coordination and collaboration
    • Propose revisions and peer review of WSDOT design & construction standards
    • Propose revisions to bridge and structures aspects of D/B Delivery
who are we continued
Who are we? (continued)
  • Team Vision:
    • Promote cost-effective, constructible, quality projects
    • Share best practices, lessons learned and new engineering
    • Establish design guidelines for all delivery methods
    • Enhance understanding of WSDOT and consultant business
    • Promote innovation
2010 2011 highlights
2010-2011 Highlights
  • Accelerated Bridge Construction (ABC):
    • Professor John Stanton, U of W & Grad Students
  • Peer Review of WSDOT Documentation:
    • Proposed BDM Chapter on Segmental Bridge Constr
    • Proposed BDM Chapter on ABC
    • WSF Terminal Structural Design Criteria
    • Load Distribution on 100” girders
  • Seismic Design
    • Write a policy statement on balanced stiffness for D/B
2010 2011 highlights1
2010-2011 Highlights
  • Share Lessons Learned:
    • SW Line Bridge Nalley Valley: Seg Box Girder Presentation – Eric Schults
    • Transfer Spans at WSF Presnetation – Jeri Bernstein
  • Development of Spread Footing Abutments on MSE Walls Policy
  • Development of D/B Issues Matrix
future
Quarterly Meetings w/ WSDOT

Continues Focus on our Purpose and Vision

Design / Build Issues

Seismic Design

Share Lessons Learned

Provide Peer Reviews