1 / 39

Tile Input Options for Phase-1

Tile Input Options for Phase-1. Topic in a nut-shell: Phase-1 FEXes receive digital signals from upgraded LArg (new FE plus DPS) Tile does not upgrade until Phase-2 Need to maintain legacy analogue path until FEXes are fully commissioned What is the best input route for Tile to FEXes ?

coy
Download Presentation

Tile Input Options for Phase-1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tile Input Options for Phase-1 • Topic in a nut-shell: • Phase-1 FEXes receive digital signals from upgraded LArg (new FE plus DPS) • Tile does not upgrade until Phase-2 • Need to maintain legacy analogue path until FEXes are fully commissioned • What is the best input route for Tile to FEXes? • Thanks to many people who contributed to these slides and discussion Tile Input Options

  2. Preliminaries Tile Input Options

  3. The Three Options TCPP PPM JEM RX L1A TileCal How to connect? FEXes L1A https://twiki.cern.ch/twiki/bin/viewauth/Atlas/TileInputOptions Numbering consistent with twiki below Tile Input Options

  4. Option 1: ‘Tile DPS’ New TCPP PPM JEM RX L1A TileCal Tile DPS FEXes L1A https://twiki.cern.ch/twiki/bin/viewauth/Atlas/TileInputOptions Requires splitting of signals at TCPP Tile DPS modules similar to LArg DPS Tile Input Options

  5. Option 2: PPM RTM TCPP PPM R T M JEM RX L1A TileCal FEXes L1A https://twiki.cern.ch/twiki/bin/viewauth/Atlas/TileInputOptions Requires new RTM for PPM Also requires new LCD daughter-card Tile Input Options

  6. Option 3: JEM TCPP PPM JEM RX L1A TileCal FEXes L1A https://twiki.cern.ch/twiki/bin/viewauth/Atlas/TileInputOptions Requires new JEM daughtercard Also same upgrade to PPM LCD daughtercard Tile Input Options

  7. The overall picture Tile Input Options

  8. IDR review request Establish a process, using external expertise, to evaluate the three options presented for directing Tile Calorimeter signals into jFEX. The evaluation should factor in the technical and funding risks, and the resources available to implement the options. A baseline should be established before the TDR. Passing note: need input to eFEX and jFEX! Will first review what steps we’ve taken Then move onto details of findings Tile Input Options

  9. Review procedure • Establish a process, using external expertise, to evaluate the three options presented for directing Tile Calorimeter signals into jFEX. The evaluation should factor in the technical and funding risks, and the resources available to implement the options. A baseline should be established before the TDR. • Set up a group of 10 members drawn from L1Calo, TDAQ, Tile, Larg and outside, with representation of each of the options • Christian Bohm, Philippe Farthouat, Stephen Hillier, Francesco Lanni, Robin Middleton, ThiloPauly, SriniRajagopalan, Carlos Solans Sanchez, Uli Schafer, Hans-Christian Schulz-Coulon • Plus several ‘ex-officio’ • Martin Aleksa, Phil Allport, Chris Bee, Ana HenriquesCorreia, Stefano Veneziano, Martin Wessels • Regular meetings on a Friday subsequent to presentations in TDAQ week • https://indico.cern.ch/conferenceDisplay.py?confId=232458 Tile Input Options

  10. Criteria for Decision Establish a process, using external expertise, to evaluate the three options presented for directing Tile Calorimeter signals into jFEX. The evaluation should factor in the technical and funding risks, and the resources available to implement the options. A baseline should be established before the TDR. Technical feasibility Disruption to existing system Installation and commissioning effort Latency Physics performance Cost and effort requirements Tile Input Options

  11. Time-scale for decision • Establish a process, using external expertise, to evaluate the three options presented for directing Tile Calorimeter signals into jFEX. The evaluation should factor in the technical and funding risks, and the resources available to implement the options. A baseline should be established before the TDR. • Note: Planning for MoU also requires a decision • TDR timescale is short • Partial TDR time-line Robin Middleton has proposed for the L1Calo sections • 23rd April: Draft 0.1 • 31stMay: Baseline Finalized • 15th June: Full Draft for L1Calo Feedback Tile Input Options

  12. Original proposed milestones TODAY • Monday 25th March • Agree process and encourage continuing investigations, such as: • Each system to study design for the important criteria • Finalize physics studies of LSB choice and noise • Wednesday 10th April • Dedicated meeting in TDAQ week with open discussion • Decide if more work and open meetings required • Post-TDAQ week • Core group to meet and discuss as required • Ask for additional information if needed • ATLAS Upgrade week: May 13th – 17th • Report from core group to be presented • Initially in joint Calo/TDAQ meeting • Aim for agreement from all sides • End of May: Upgrade Steering Group • Decision presented and finalized Tile Input Options

  13. More details on options:a few key features Tile Input Options

  14. Option 1: Tile DPSData branching Replace 64 TCPPs in 4 crates 256 Tile input cables 128 calo output cables 128 muon output cables Add ADCs and digital output Tile Input Options

  15. Option 1: Tile DPSData processing Tile Input Options • Use pre-existing LArg DPS technology and crates • Similar (if not identical) infrastructure, algorithms, firmware etc • Just 1 or 2 extra DPS modules • Option to include Tile D-layer from Day-1 • Possible advantages for jet punch-through

  16. Option 2 and 3:Double speed data transmission Both options require more data out of PPM Achieved via new MCMs (2015) and new LCD (2018) Internal double data rate already tested with nMCM 32 PPMs in two crates require new LCD Tile Input Options

  17. Option 2:Data Branching via PPM REX New RTM for 32 PPMs in two crates Contains FPGA for data conversion and optical outputs Legacy digital cables as before, signals pass through RTM Tile Input Options

  18. Option 3:Data branching via JEM JEM receives double data rate in new input daughtercards Three of these retransmit optical signals Signal transmission over 11m LVDS cables to be tested Tile Input Options

  19. Evaluation Tile Input Options

  20. Group evaluation of options https://twiki.cern.ch/twiki/bin/viewauth/Atlas/TileInputOptions • Initially I summarized my thoughts • We sought extra input on some items • Though not all issues can be addressed on this time-scale • Looked in more detail at some topics • Discussed evaluations • Christian Bohm set up twiki for documentation and comments • Evolved with input from several people • Upcoming slides are a summary of the twiki as it stands Tile Input Options

  21. General remarks • Option 1 digitization is a new development, where we already have a digitization solution that is known to be working • But it is no tougher than than the LArg FE upgrade • The output of each option to eFEX and jFEX should be identical, no matter the route to get there • For the core Tile towers anyway, and it should be similar to HEC output • Most of the rest of the twiki addresses the criteria for the decision Tile Input Options

  22. Technical Feasibility • The ‘active-TCPP’ has not yet been demonstrated, particular in its effect on the legacy signals • But, as before, this solution is similar to the LArg FE, and should be no more difficult • Transmission of double data rate over LVDS has yet to be demonstrated for Option 3 • Though some of the path is already tested with the nMCM, so Option 2 is closer to being proved • Overall, none of the solutions look to be ‘challenging’ • Solutions near at hand, or at least if the solution does not work, then Phase-1 Upgrade is already in trouble • No reason to believe any option is harder than the others Tile Input Options

  23. Disruption to existing system/Installation and commissioning effort • Option 3 appears to be favoured • Purely replacement of daughter-cards • Small amount of extra optical cabling, but this is necessary anyway for all solutions • Option 1 and 2 require re-cabling • Option 1: at least 384 analogue cables in four crates • Option 2: about 500 LVDS cables in two crates • Re-cabling in both cases will mean adjustment to strain relief • From bitter experience, handling lighter LVDS cables is a lot easier than the heavy analogue cables • Daughter-card replacements can be done in small quantities • TCPP replacement likely to be one crate at a time (at least) • Note, even with differences, probably small perturbation to overall disruption in LS2 due to LArg upgrade and addition of FEXes Tile Input Options

  24. Latency • Latency will be tight, and this is a key criteria • For Option 2 and 3, latency for signals to FEXes will be a 2-3 BCs more than current availability at processors • Inevitable with addition of optical encoding • Estimates for Option 1 in line with LArg processing and other options • Probably no big difference to other routes • Conclusion: though latency is critical, there’s probably not a big difference in the three options Tile Input Options

  25. Physics Performance • This divides into two areas: • Can we improve the signal quality to the processors? • Does extra data (Tile D-layers) help the trigger? • Signal Processing • New filters, correction techniques may improve performance • Flexibility not available with currents MCMs • But these are already being replaced in 2015 • Comparison of processing resources in FPGAs • Tile DPS will use advanced powerful FPGAs • But each one is expected to process several hundred channels • Possible advantage by cross-correlating with other channels • PPM nMCMs are smaller, but only process four channels each • Overall, PPM will have more processing resources Tile Input Options

  26. Physics Performance • This divides into two areas: • Can we improve the signal quality to the processors? • Does extra data (Tile D-layers) help the trigger? • Tile D-layer • Could be available in Tile DPS from day-1 • Slightly more expensive, baseline comparison is without this option • For Option 2 or 3 could provide this data, but only when legacy system de-commissioned • Possibility to improve jet resolution? • Note that signals were designed for muon output • High gain, saturate at 12 GeV • Judge that there may be some advantage in Option 1 • But usefulness is yet to be proven Tile Input Options

  27. Cost Requirement • Comparison of options without D-layer • Core costs only • For details see the backup slides • Option 1: €145,000 • Option 2: €80,000 • Option 3: €110,000 • Of course all these depend on exact choice of FPGAs etc Tile Input Options

  28. Effort Requirement • To be honest we haven’t gone into this in detail • And we are all at the whim of funding agencies • However, worth assessing likely available effort • Option 1: Strong expectation that support for this will be funded and bring in new effort • Option 2: Effort clearly available within PPM group • Option 3: PPM effort again clear, but JEM effort will be split between this and other upgrade projects • Note this commits effort to long-term maintenance of PPMs/JEMs Tile Input Options

  29. Impact on Phase-2 Upgrades • Bold statement that hasn’t been challenged • There should be no impact • This is purely a stop-gap solution for LS2 to LS3 • Hardware will be ‘junked’ in LS3 • So vice-versa, I argue that there’s no Phase-2 ‘synergy’ argument for any option Tile Input Options

  30. Summary Table • Caveat: Differences, where they have been identified, are not necessarily very large 1 = best, 3 = worst Tile Input Options

  31. Conclusion • The core group has not reached a full consensus • Though there was a preference among many for Option 3 at the last meeting • We would be grateful for further insights from this meeting today • Ideally we would reach a decision • Otherwise, we will meet again next week to decide how to proceed • Again ideas welcome • One option is to write a short document to be made available for a small group to make a decision • Still would like to finish this in time for the Upgrade SG Tile Input Options

  32. BACKUP Tile Input Options

  33. Tile Input Options

  34. Tile Input Options

  35. Tile Input Options

  36. Tile Input Options

  37. Tile Input Options

  38. Tile Input Options

  39. Tile Input Options

More Related