a pesentation on wind energy generation by n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
A PESENTATION ON WIND ENERGY GENERATION BY PowerPoint Presentation
Download Presentation
A PESENTATION ON WIND ENERGY GENERATION BY

Loading in 2 Seconds...

play fullscreen
1 / 14

A PESENTATION ON WIND ENERGY GENERATION BY - PowerPoint PPT Presentation


  • 124 Views
  • Uploaded on

A PESENTATION ON WIND ENERGY GENERATION BY. S.P.S.NEEMRANA. SE(E). WIND ENERGY GENERATION. 80% depreciation in the first year (Commissioned before September end) 40% depreciation in the first year (Commissioned before March end). WIND ENERGY GENERATION. LAND.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'A PESENTATION ON WIND ENERGY GENERATION BY' - corinne


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
wind energy generation
WIND ENERGY GENERATION
  • 80% depreciation in the first year (Commissioned before September end)
  • 40% depreciation in the first year (Commissioned before March end)
slide4
LAND

VESTA RRB : Cost of land included limited to Rs. 6 Lakhs.

Registration charges extra.

SUZLON: Cost of land included limited to Rs.15 Lakhs.

capacity
CAPACITY

INITIALCOST

VESTA RRB –

600 KW

SUZLON-600 KW

VESTA RRB –

350Lakhs

SUZLON-395 Lakhs

payback period approx
PAYBACK PERIOD(APPROX)

LIFE EXPECTANCY

VESTA RRB –

20 Years

SUZLON-

20 Years

VESTA RRB -

7 Years

SUZLON-7 Years

generation units per annum
GENERATION(Units per Annum)

VESTA RRB

14,00,000 units per Annum

SUZLON –

17,00,000 units per Annum

slide8
AMC

VESTA RRB : Annual Operation & maintenance contract available.

SUZLON : From 2nd year from date of commissioning to 10th year Rs.10 Lacs per WTG with 5% annual escalation after second year, for each year cumulatively.

interfacing with grid
INTERFACING WITH GRID

VESTA RRB:

If the OHT line exceeds 250 m then extra @ Rs.8/- Lakhs per KM.

salient features vesta
SALIENT FEATURES-VESTA

VESTA RRB Indo-Danish joint venture for manufacture of wind electric generators.

Microprocessor based fully automatic control system.

Integrated power transmission mechanism.

ISO 9001:2000 Certification for manufacture, installation and servicing of WEGs from DNV.

salient features vesta1
SALIENT FEATURES- VESTA

First WEG in India to receive the type approval certificate from C-WET (Centre for wind energy technology), an autonomous body offers the pitch regulated WEGs.

This feature allows the blades to pivot along their longitudinal axis. As the wind velocity increases, the surface against the wind decreases

salient features suzlon
SALIENT FEATURES- SUZLON

SUZLON R & D at Suzlon Energy GmBh Germany for Wind energy converters & AE - Rotor Technical BV Netherlands for rotor blades.

Minimum stress and load through well balanced weight distribution.

Advanced hydrodynamic fluid coupling absorbs load peaks

salient features suzlon1
SALIENT FEATURES- SUZLON

Hi-speed asynchronous generator with multi stage intelligent switching compensation system delivers power factor up to 0.99

Grid friendly design generates harmonics free pure sinusoidal power

Unmatched fine pitching with 0.1 degree resolution to extract every possible unit of power