An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. tc Transformationscenter Peter Åberg, Metria

  2. Omfattning- Transformera projektdata till Sweref 99- Transformera systemdata till Sweref 99- Kompetensstöd

  3. Projektdata till Sweref 99 • 600+ investeringsprojekt avropar • 2012 ska allt vara transformerat • Pilotprojekt - Hallandsås • Mätfiler/Cad-filer/tabelldata/GIS-format/etc. • Transformering av spårgeometrier I annat projekt

  4. 2012 2010 2011 q1 q2 q3 q4 q1 q2 q3 q4 Projekt C, transformerar till SWEREF 99 ute i projekten Investeringsprojekt Tidplan Projekt A, levererar i RT 90 innan 2011 Projekt B, kan starta i SWEREF 99 Projekt A: avslutas under 2010 Projekt B: startas under 2010 Projekt C: pågående under 2010, 2011

  5. Transformation till SWEREF 99 Investeringsprojekt - ca 600 RT 90 ”Transformations- Center” Projekt CAD Mät Data- samordnare Annat Tekn Kontroll- funktion SWEREF 99 Investeringsprojekt vs TC

  6. Systemdata till Sweref 99 • Ca 10 system avropar TC • Övriga system (ca 20): Nymätning eller samkörning • Färdigt under 2010 • Tabelldata/XML-dokument

  7. Teknisk plattform för TC • Virtuell Server 5 användare • FME Desktop • GTrans-samband framtagna av Metria • MicroStation + DP/Cnv • TopoCAD • Google Earth

  8. Bemanning • En handfull användare I nuläget • Spårgeometriexpertis • Geodetisk, fotogrammetrisk, databasteknisk expertis nära knutet till TC • Uppdragsledare - Urban Carlbäcker,Metria • Datasamordning/FME - Nils-Erik Dahlsten, Metria