1 / 18

WMIRS Flight Academy Management (FAM)

WMIRS Flight Academy Management (FAM). Briefing for Flight Academy Staff Summer 2019. FAM Screen – Purpose and Scope. An electronic system meeting CAPR 70-1 9.10.2.1.2 requirements Multiple flights at the same location and on the same day

conforti
Download Presentation

WMIRS Flight Academy Management (FAM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WMIRS Flight Academy Management (FAM) Briefing for Flight Academy Staff Summer 2019

  2. FAM Screen – Purpose and Scope • An electronic system meeting CAPR 70-1 9.10.2.1.2 requirements • Multiple flights at the same location and on the same day • Can be released without passenger, flight time, and estimated landing time information • Each aircraft and PIC combination must be identified in advance • Someone on the ground must track occupants and flight times to confirm safe execution • Note: Relocation sorties do not meet these requirements, thus use of standard Sortie Edit will be required • Streamline sortie scheduling, editing, close out and reporting • Adds multiple flight release based on Instructor Pilot – using Release Flights • Does not provide additional relief from or modification of CAPR 70-1 pre-flight risk assessment & flight release requirements – these are customer requirements

  3. FAM Screen Overview Maint Time Resources Reports Add/Edit Window Status Only

  4. FAM Screen Resources ALL QUALIFIED PILOTS NON-PILOT STAFF

  5. FAM Screen Add and Edit

  6. Access Standard Sortie List - RELO

  7. Preflight Risk Assessment

  8. FAM Screen – RA&R (Relo, Solo, Tow) • This is the Standard eFR page. • “PIC-seat” used for Copy ORM/Multiple Release • Cadets must have their “Solo Pilot” qualification in Ops/Quals before they can be released on a solo • This requires preplanning and adaptability • Note the lack of navigation on the left and in the eFR Release Information block - you must use the back arrow to return

  9. FAM Screen – RA&R (Flt Inst) If the instructor only has pending sorties on a single day, the eFR for that day will load; otherwise, the Date selector appears. If a pilot has pending releases for multiple aircraft models, only those for the model used on the first sortie will appear. Once those are released, the sorties for the other model of aircraft will appear. Note: Mixed mission types can be presented.

  10. Copy ORM and Multiple Release All Q&As are copied

  11. ORM and eFR Status Feedback

  12. Glider RA&R: Paper-based Process

  13. FAM Edit-Void Rules • Changing date to the following day will void release • Adding, editing, deleting “crew” information varies • Relo, Glider Tow, FltInstr • SOLO (and “shotgunned” Solo)

  14. FAM Screen Sortie Close-Out

  15. FAM Screen Reports

  16. Avoiding System Bottlenecks ORM ORM ORM ORM ORM ORM FRO FRO FRO FRO FRO FRO t =0 t1 =22 t6 =37 Nominal Times for RA&R Activities • Sign Out/In ~ 1 min • ORM or paper-based RAW ~ 2 minutes • eFR or paper-based FRO checklist ~ 3 minutes One computer / serial processing ORM FRO FRO FRO ORM YOUR RESOURCE AVAILABILITY/APPROACH MAYREQUIRE YOU TO START THE TIMELINE THE EVENING PRIOR ORM FLT OPS START ORM FRO FRO FRO ORM ORM t1 =6 t =0 t6 =12 Multi-devices / parallel processing

  17. Workarounds That Are Work Traps CAPR 70-1 9.10.2.1.2 – Release on CAPF 99 • Execution • Each pilot does a paper-based pre-flight risk assessment (ORM) • FRO uses CAPF 99 to release multiple sorties (records ORM score?) • Post-execution • FRO must enter release within 24 hours (can input ORM score) • PIC must enter ORM within 72 hours of landing (must enter all data) • Copy ORM not available until an ORM has been entered • Multiple flight release not available unless ORM has been copied • Everything must be done at least twice, maybe more

  18. Miscellaneous Items • When using an iPad and Chrome – the Approve button at the bottom of the eFR Details page will not be visible. Enter your CAPID and Code, then retract the keyboard to access the Approve button. • Instructions on using the Beta Test site will be sent via email later this week • Mission numbers will be issued once training is complete for your activity • Questions?

More Related