NERC Report. Jerry Rust WECC October 21, 2010. BARC Elimination of Manual Time Error Correction – Field Test Frequency Response Initiative Event Analysis Program. BARC. Balancing Authority Reliability-based Control (BARC).

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'NERC Report' - columbia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
nerc report

NERC Report

Jerry Rust

WECC

October 21, 2010

slide2

BARC

  • Elimination of Manual Time Error Correction – Field Test
  • Frequency Response Initiative
  • Event Analysis Program
balancing authority reliability based control barc
Balancing Authority Reliability-based Control (BARC)
  • BARC will propose a SAR to address issues with four BAL standards. The purpose of the set of four standards is to ensure that BAs take action to maintain interconnection frequency with each BA contributing its fair share to frequency control without burdening transmission facilities with excessive imbalances of load and generation.
balancing authority reliability based control barc1
Balancing Authority Reliability-based Control (BARC)
  • The SAR is intended to address
    • FERC Final Rule “Mandatory Reliability Standards for the Bulk-Power System, FERC Order 693” on the NERC standards BAL-002, 004, 005, and 006
    • To specify the Time Error Correction, special Area Control Error cases, and Inadvertent Interchange reliability requirements/business practices with NERC and NAESB collaborative participation
    • To incorporate the necessary content, structure, and language to comply with the NERC standard process
balancing authority reliability based control barc2
Balancing Authority Reliability-based Control (BARC)

The SAR expands on the work already under way with the BAL-004, 005, 006 SARs by requiring that BAL-002, 004, 005, and 006 be upgraded in accordance with the NERC Reliability Standards Development Plan

manual time error correction field test
Manual Time Error Correction – Field Test
  • Proposed Field Test for all Interconnections
    • Effective January 1, 2011
  • BAL-004
    • R2. The Interconnection Time Monitor shall monitor Time Error and shall initiate or terminate corrective action orders in accordance with the NAESB Time Error Correction Procedure
  • Field Test – suspend NAESB thresholds for Time Error Correction Procedure.
  • Impact – All interconnections
manual time error correction field test1
Manual Time Error Correction – Field Test
  • WECC to present a minority opinion report at the NERC OC recommending that the Interconnections should be able to elect through their respective process whether or not to participate in a Field Test
  • Goal
    • Let one Interconnection learn if there are issues
      • Frequency based timing for metering
      • Frequency time devices – Traffic Control
      • Others
  • Impact – The Consumers
frequency response initiative new terms
Frequency Response Initiative – New Terms

Minimum Reliable Interconnection Frequency Response

Frequency Response Obligation

Frequency Response Measure

Single Event Frequency Response Data

frequency response initiative proposed time line 2010
Frequency Response Initiative – Proposed Time Line - 2010
  • March 18 – FERC Order sets 6-month deadline to modify BAL-003 (later extended one month).
  • July 23 – Post proposed modifications to BAL-003 for 45-day period.
  • November 15 – Post drafting team response to comments.
  • November 30 – Post proposed modifications for 30-day period.
frequency response initiative proposed time line 2011
Frequency Response Initiative – Proposed Time Line - 2011
  • January 23 – Post proposed standard for pre-ballot.
  • March 6 – Post Drafting Team’s reply to comments.
  • March 21 – Post recirculation ballot.
  • April 25 – Receive NERC Board approval.
  • June 11 – File documents with appropriate regulatory authorities.

Impact and Coordination with BARC

event analysis program goals
Event Analysis Program –Goals

Promoting Reliability

Developing a Culture of Reliability Excellence

Collaboration

Being a Learning Organization

event analysis program document
Event Analysis Program –Document

Electric Reliability Organization Event Analysis Process

www.nerc.com/docs/eawg/Event_Analysis_process_WORKINGDRAFT_100110-Clean.pdf

Field Test

Follow-up Webinar will be held to discuss the results of the field test an to present the final version of the document for use by the industry