1 / 11

PowerPoint Title Sub heading if required

PowerPoint Title Sub heading if required. Northern Powerhouse Rail Freight meeting 17 th May 2016. Powerhouse Rail Network. Body copy Body copy Body copy Body copy Body copy Body copy. Conditional outputs. Reduced journey times between cities

colive
Download Presentation

PowerPoint Title Sub heading if required

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PowerPoint TitleSub heading if required Northern Powerhouse RailFreight meeting 17th May 2016

  2. Powerhouse Rail Network • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy

  3. Conditional outputs • Reduced journey times between cities • Increased capacity to cater for economic growth forecasts • Minimum city to city connectivity frequencies • For NECA starting point 4 additional trains per hour cutting the journey time Newcastle to Leeds from 90 minutes to 60 minutes and providing 100% to 130% capacity increase • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy

  4. Other related rail studies / influences • HS2 • East Coast Route Study • North East Route Study • TfN Local Strategic Connectivity workstream • TfN Freight workstream • SEP projects / aspirations • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy

  5. Leeds to Newcastle Specifics • increased rail services • Capacity uplift 100% to 130% • Reduce journey times from 90mins to 60mins • Minimum frequency 4tph • Infrastructure and Station workshops as part of EC route study • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy Freight Trans-Pennine CrossCountry LDHS Local HS2 NPR

  6. CONCEPT A and B Newcastle Hull Leeds Manchester Vic New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Concept B (northern) Current NR route Link provided to access HS2 route HS2 Concept A Manchester Pic Liverpool Concept B (southern) New or upgraded route Sheffield (Midland) Manchester Airport

  7. CONCEPT C Newcastle Hull Leeds Manchester Vic New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Current NR route Link provided to access HS2 route HS2 Manchester Pic Liverpool New or upgraded route Sheffield (Midland) Manchester Airport

  8. North East issues • Quantum of trains proposed on existing lines difficult (expensive) to achieve (including Freight) • Removal of constraints/ New line / significant cut offs / upgrade Leamside • Station capacities • Cost – vs – Benefits of calling at other centres of economic significance • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy

  9. Removal of Constraints / New lines / Cut Offs / Upgrades • Options under consideration • Sections of 4 track railway • Reduce delay at Junctions • Reduce delay at Intermediate Stations • Use of Leamside • Body copy • Body copy • Body copy • Body copy • Body copy • Body copy

  10. Programme milestones • Autumn Statement / Spring Statement • Aim to sift options to provide small number of alternatives on each corridor for high level model testing / engineering feasibility / costing. • Agreed methodology of comparing corridor options and ranking them. • Agreed methodology for sequencing between corridors. • East Coast route study to publish for consultation in December

  11. Any Questions

More Related