1 / 34

簡 報 Briefing

新竹生物醫學園區 Hsinchu Biomedical Science Park. 簡 報 Briefing. 報告人:科學工業園區管理局 Speaker: Hsinchu Biomedical Science Park Administration. 簡報內容 Contents. 壹、園區規畫 概 述. 貳、園區規劃設計摘要. 1. Summary of the Planning of the Park 2. Introduction to the Design of the Park.

cloris
Download Presentation

簡 報 Briefing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 新竹生物醫學園區 Hsinchu Biomedical Science Park 簡 報 Briefing 報告人:科學工業園區管理局 Speaker: Hsinchu Biomedical Science Park Administration

  2. 簡報內容 Contents 壹、園區規畫概述 貳、園區規劃設計摘要 1. Summary of the Planning of the Park 2. Introduction to the Design of the Park

  3. 壹、園區規畫概述1. Summary for the Planning of the Park

  4. 一、計畫緣起 1.Origin of the Plan Executive Yuan 科管局委託台大 成立「生醫籌備處」 奉行政院核定設置計畫 科管局接管自辦 92年3月28日 92年6月27日 95年9月01日 Authorized by Science Park Administration, Taiwan University found the Biomedical SciencePreparatory Office on June 27, 2003 The Biomedical SciencePreparatory Office ran by Science Park Administration on Sep. 1, 2006 The Plan was approved by Executive Yuan on March 28, 2003

  5. 二、區位及範圍 2.Location & Boundary 西北距竹北市公所及縣政府約3公里 3Km away from Chubei City Hall & Hsinchu County Government at Northwestern direction. HSR Station Touqian River Science Park Administration Office Biomedical Science Park National Highway #3 西南據新竹市區約8公里 About 8Km away from Hsinchu downtown area at Southwestern direction.

  6. 面積總計 381,995m2 三、土地使用規劃(1/7) 3.Land Use Planning Service Facilities:Public ParkingRoadsLandscapeEnergy CenterEnvironment Protection Facility Medical Treatment Area #1 必要性服務設施 醫療專一區 公共停車場 道路 綠地 能源中心 環保設施用地 78,512m2 Total Area: Medical Treatment Area #3 醫療專三區 137,985m2 Medical Treatment Area #2 Medical Treatment Area #4 醫療專四區 醫療專二區 25,048m2 24,870m2

  7. 三、土地使用規劃(2/7) 3.Land Use Planning Medical & Cancel Treatment Center 850 beds Hospital Medical Treatment Area #1 Research Center Clinical Test & Research Enterprise Medical Treatment Center Enterprise Medical Treatment Buildings Treatment Complex Area #2 Hadron Center Hadron Treatment Center Medical Treatment Area #2 Medical Treatment Equipment R&D Enterprise Medical Treatment Equipment R&D

  8. 三、土地使用規劃(3/7) 3.Land Use Planning Park Administration Center Park Administration Building Innovative & Creative Center Office, Meeting Room, Laboratory Joint Research Center Cutting Edge Tech. Organization, Laboratory, Mid-size Medical Company Animal & Cell Cultivate Facility Animal & Cell Cultivate Center Common Used Precision Equipment Center Precision Equipment Center Medical Treatment Area #3 Incubation Area Short-term Study, Human Resource, Outsourcing Research Engineer Facility Education Center Living Supply Center Food & Drink, Shopping Center, Entertainment Facility

  9. 三、土地使用規劃(4/7) 3.Land Use Planning Medical Treatment Equipment R&D Location for the Medical Treatment Equipment R&D Biomedical R&D (Bio-laboratory) Biomedical Research Center Possess Bio-laboratory Biomedical R&D (Tech. Type) Biomedical Research Center not Possess Bio-laboratory Medical Treatment Area #3 Enterprise Area Information System (Office Type) General Office

  10. 三、土地使用規劃(5/7) 3.Land Use Planning Food & Drink Facility Public Facility For the Park Meeting Room Public Facility For the Park Library Public Facility For the Park Medical Treatment Area #4 Common Facility Health Center Public Facility For the Park Bus Parking (B1) Public Service Facility For the Park

  11. 三、土地使用規劃(6/7) 3.Land Use Planning Public Parking Public Service Facility For the Park Road Public Service Facility For the Park Landscape Public Service Facility For the Park Service Area Energy center Public Service Facility For the Park Environment Protection Area Public Service Facility For the Park except for the Medical Waste Disposal Treatment Facility Plaza Planned Plaza Area Reserved Area for Local Temple

  12. 三、土地使用規劃(7/7) 3.Land Use Planning 民間企業區 Enterprise Area Medical Center Central Green Belt & Parking Lot 醫療中心 中央綠帶 及地下停車場 Energy Center 能源中心 Hadron Center 強子中心 Site Plan of The Park 全區配置計畫圖

  13. 四、分期分區開發(1/4)4.Development Phases 第一期 第二期 第三期 Phase 1 Phase 2 Phase 3 能源中心一、醫學中心(含癌症中心,預估為700 床規模)、研究中心(計畫規模之50%)、育成區(計畫規模的之50%)、公共停車場、道路、綠地。 能源中心二、強子中心、民間醫療服務設施(計畫規模之50%)、育成區(計畫規模之50%)、民間企業區(計畫規模之50%)、其他共同化設施(計畫規模之50%)。 能源中心三、醫學中心(增建)、研究中心(計畫規模之50%) 、民間醫療服務設施(計畫規模之50%) 、民間企業區(計畫規模之50%)、其他共同化設施(計畫規模之50%)。 Energy Center 2, Hadron Center, Enterprise Medical Service Facility(50%), Incubation Center(50%), Other Common Facility(50%). Energy Center 3, Medical Center (Expansion), Research Center(50%), Enterprise Medical Service Facility(50%), Enterprise Area(50%), Other Common Facility(50%). Energy Center 1, Medical Center (700 beds), Research Center(50%), Incubation Center(50$), Public Parking, Plaza, Road, landscape. 2005~2007 2008~2009 2010~2012

  14. 四、分期分區開發(2/4)4.Development Phases 第一期 Phase 1 Energy Center 1, Medical Center (700 beds), Research Center(50%), Incubation Center(50$), Public Parking, Plaza, Road, landscape. 能源中心一、醫學中心(含癌症中心,預估為700 床規模)、研究中心(計畫規模之50%)、育成區(計畫規模的之50%)、公共停車場、道路、綠地。 2005~2007

  15. 四、分期分區開發(3/4)4.Development Phases 第二期 Phase 2 Energy Center 2, Hadron Center, Enterprise Medical Service Facility(50%), Incubation Center(50%), Other Common Facility(50%). 能源中心二、強子中心、民間醫療服務設施(計畫規模之50%)、育成區(計畫規模之50%)、民間企業區(計畫規模之50%)、其他共同化設施(計畫規模之50%)。 2008~2009

  16. 四、分期分區開發(4/4)4.Development Phases 第三期 Phase 3 能源中心三、醫學中心(增建)、研究中心(計畫規模之50%) 、民間醫療服務設施(計畫規模之50%) 、民間企業區(計畫規模之50%)、其他共同化設施(計畫規模之50%)。 Energy Center 3, Medical Center (Expansion), Research Center(50%), Enterprise Medical Service Facility(50%), Enterprise Area(50%), Other Common Facility(50%). 2010~2012

  17. 貳、園區規劃設計摘要2. Introduction to the Design of the Park

  18. 一、上位計劃1. Upper-level Plan 計畫名稱 • 台灣北部區域計畫 營建署 • 新竹科學城發展計畫 新竹縣政府 • 新竹縣綜合發展計畫 新竹縣政府 • 高鐵新竹車站特定區計畫 新竹縣政府 • 新竹生物醫學園區計畫 行政院 主管單位 Plan Name Administration Dept. • Northern Taiwan Area Planning---Construction and Planning Agency • Hsinchu Science City Development Plan---Hsinchu County Government • Hsinchu County Development Plan---Hsinchu County Government • Hsinchu High Speed Rail Station Designated District Plan---Hsinchu County Government • Hsinchu Biomedical Science ParkPlan---Executive Yuan

  19. 二、道路系統2. Road System 5 Secondary Roads Major Road 主要道路 L:2178m W:20m 五條 次要道路 L:1009m W:12m 3 Connection Roads 三條 聯外道路 L:122m W:22m

  20. N 邊 溝 新設箱涵1.5MX1.5M 既有箱涵2MX2M 三、排水系統3. Drainage System North 北 South 南 Gutter New Drainage Tunnel Existing Drainage Tunnel

  21. 設置五處水質流量監測點 設置二處水質流量監測站 四、污水系統4.Sewage System 5 Water Quality Monitor Stations 各區污水收集至各區收集井 各區污水收集井至300mm∮支管 經南北400mm∮幹管納管至高鐵特定區污水系統 2 Water Quality Monitor Stations The waste water is collected into local collection-well. Collection-well is connected to a 300mm ∮Side Pipe. Via North-South 400mm ∮ Main Pipe, the water is directed into HSR Sewage System.

  22. 1 3 5 西側台電引入3∮22.8KV既有高壓人孔 主變電站 台電配電室 次變電站 東側預留台電引入管路 共同管道內架設線架供台電 高壓纜線佈設 南側預留台電引入3∮22.8KV 五、電力高壓系統5.High Voltage Electricity System Tai-power Mechanical Room Main Power Station Secondary Power Station 以迴路方式引入每一民企區 Connected into enterprise area Tai-power Pipeline connected (3∮22.8KV) Reserved Pipeline area for Tai-power Common Pipe Tunnel equips with pipeline-rack for Tai-power electricity cable. Reserved Pipeline area (3∮22.8KV) for Tai-power

  23. 1 3 2 4 西側負載由主變電站供電(路燈泵浦….) 東側負載由次變電站供電(路燈泵浦….) 主變電站 次變電站 緊急發電機二組供電(消防及維生系統)(設於停車場) R0道路 六、電力低壓系統6.Low Voltage Electricity System Main Power Station supplies the west area requirements. (Street light, pump…) Secondary Power Station supplies the east area requirements. (Street light, pump…) Main Power Station Secondary Power Station Two sets of emergency power generators. (Fire Extinguish & Life Supply System) (Allocated in Parking Lot)

  24. 1 3 2 4 次要道路: 單臂型路燈250Wx1複金屬燈 平均照度15Lux以上 單臂型路燈 主要外環道路: 雙臂型路燈250Wx2複金屬燈 平均照度20Lux以上 雙臂型路燈 七、路燈系統7.Street Light System Secondary Road: Single-arm street light. Duplex-metal light. Ave. illumination: above 15Lux Single-arm street light Main Road: Double-arm street light 250Wx2. Duplex-metal light. Ave. illumination: above 20Lux Double-arm street light

  25. 瓦斯西側幹管引入 100mm∮幹管供應北側民企區 八、瓦斯系統8.Gas Supply System 1 1 1 1 2 2 2 2 100mm ∮main pipe to supply Northern Enterprise Area Connected to Gas Pipe

  26. 自來水表二次側接管 採150mm不鏽鋼管環區配置 南北二側供水 全區每隔60~80M設一處 自來水表二次側接管 九、道路消防栓系統9.Fire Hydrant System Water Supply Secondary Connection 150mm ∮stainless pipe surrounding the park. Water is supplied from North & South sides. One for each 60-80 M Water Supply Secondary Connection

  27. 電信機房 南側電信人孔引入光纖 十、電信系統10.Telecommunication System 預留各民企區電信管路 Reserved Telecommunication Pipes for Enterprise Area 共同管道電信管路 Common Telecommunication Pipes Telecommunication Mechanical Room Connected to optical fiber

  28. 流量監測點 停車場副控室 監測資料以光纖傳回主控室 水質流量監測站 主控室/副控室相互支援 管理中心主控室 十一、監控系統11.Monitoring System Water Quality Monitor Station Parking Lot Secondary Monitor Station Data are transferred back to Main Monitor Station via optical Fiber. Water Quality Monitor Station The Main and Secondary Monitor Station is able to back each other. The Main Monitor Station is located in Administration Center.

  29. 北配水池大於6614M³ 200mm支管分別供應各民企區及醫院區 300mm 300mm幹管 共同管道 300mm 南配水池大於6614M³ 南側400mm幹管引入 十二、自來水系統12.Water Supply System The capacity of northern water tank shall be more than 6614M³ 200mm side pipe supplies Enterprise Area and Medical Center Main Pipe Common Pipe The capacity of southern water tank shall be more than 6614M³ 給水量7137CMD Water Supply Capacity: 7137CMD Connected to main pipe 400 mm

  30. 200mm支管分別供應各民企區噴灌,沖廁使用 屋頂雨水 屋頂雨水 屋頂雨水 屋頂雨水 收集井 收集井 收集井 收集井 收集井 300mm幹管 共同管道 中水貯存槽 收集井 收集井 屋頂雨水 屋頂雨水 十三、中水系統13.Conserved Water Supply System 200mm side pipe supplies Enterprise Area and Medical Center Roof Rain Water Roof Rain Water Roof Rain Water Roof Rain Water 屋頂雨水 Roof Rain Water 300mm Main Pipe Water Tank Collection-well Common Pipe 補充景觀水池使用 For Landscape Use Only. Roof Rain Water 中水量1365CMD Roof Rain Water Conserved Water Supply Capacity: 1365CMD

  31. 十四、土地使用強度管制圖14. Intensity of Land Use

  32. 十五、建築基地退縮管制圖15. Setback Requirement 10 Meters8 Meters6 Meters4 Meters

  33. 十六、停車空間16. Parking Space 產業專用區區內建築基地之附設停車空間應依下列各點辦理,且不得移作他途使用,惟日後可視實際狀況,經新竹縣都委會同意後予以調整。 (一)園區各開發單元除醫療專一區內小汽車以建築技術規則(59 條)規定 之停車位數量乘以1.5 倍計算;其他各區小汽車一律以建築技術規則(59條)規定之停車位數量乘以1.4 倍計算。 (二)同一幢建築物或同一基地內供二類以上用途使用者,其設置標準分別依建築技術規則(59 條)規定計算附設之。 (三)建物應提供不少於法定停車數量之百分之二為殘障停車位(至少需提供一停車位)。 (四)機車位數以建築物總樓地板面積,每滿200 平方公尺設置一輛計算。機車停車位須長2 公尺以上,寬0.9 公尺以上,通道寬度1.5 公尺以上。 (五)停車空間之汽車出入口應距離道路路邊交叉點或截角線、路口轉彎處圓弧起點、穿越斑馬線、橫越天橋或地下道出入口十公尺以上。 (六)凡建築物增設停車空間,得依「新竹縣建築物增設停車空間鼓勵要點」規定辦理 Car park areas shall be determined according to the following requirements, and shall not be used for other purposes. (1)The number of car park for all areas in the science park except for Medical Treatment Area #1 shall be computed at 1.5 times of the requirements of the Building Technical Regulations (Article 59); The number of car park for all others areas in the science park shall be computed at 1.4 times of the requirements of the Building Technical Regulations. (Article 59) (2)For the same building or same site providing for more than 2 types of usages, the required number of car park shall be the same as the requirements of the Building Technical Regulations. (Article 59) (3)The building shall provide no less than 2% of the number of car park for disabled parking lots (provide at least one parking lot). (4)For the number of motorcycle parking lots, one parking lot shall be allocated for every 200 m² of space area. The dimension of motorcycle parking lot shall be more than 2m in length and more than 0.9m in width, and the width of the passageway shall be above 1.5m. (5)The entrance/exit of car park space shall be more than 10m away from the roadside intersection or boundary line, intersection point of corner arc, zebra crossing, overpass bridge or underground passageway. (6)Allocating for more car park space than the regulations shall be carried out according to the “Encouraging Regulations for Allocating More Car Park Space in Hsinchu County”.

  34. 簡報完畢 Thank You!

More Related