An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alternative Technology Regulation Pilot Program – v2gNE Presentation Jessica Millar, President v2gNE jessica@v2gne.com 21 August 2009

  2. The Technology: EV/PHEV Batteries • Initial vehicles will be totally electric (EV), and capable of returning electricity back to the grid when plugged in (v2g). • AC Propulsion eBoxes • Ford E-F250 conversions • In time, v2gNE is open to the inclusion of vehicles that do not return electricity, but only vary their charging rate (v1g). This includes plug-in hybrid electric vehicles (PHEVs) as well as EVs.

  3. The Technology: v2g features/liabilities • 30 kW range (-15 kW to +15 kW) vs. 3 kW range • Discharging wears down the battery • Distributed energy storage (likely necessary for high penetration of renewable energy) • Distributed energy storage (more difficult to integrate into current grid than 1-way charging)

  4. v2gNE Milestones • June 2010 • First 30 fast charging, bidirectional electric vehicles online • First two turbines at New Hope up for use in wind balancing tests • At least 3 months of performance testing on various load balancing and power stabilization services (goal: 400 EVs produced in 2010) • Year 2( 2011) • Vehicle usage studied • Wide-scale deployment of charging stations throughout RI • EV production at 500 units a month • Micro grid demo of Scalable Energy Platform • Year 3( 2012) • Commercialize first production-scale vehicles • Launch manufacturing plant for smart EVs and associated products

  5. EV/PHEVs as Energy Resources • Necessary piece of puzzle for 80% carbon reduction • Short-term Profit Mechanisms: • Regulation (ISO/RTO as primary actor, relatively high return, minimal impact on driving behavior) • Time of Use charging (utility) • Wind Balancing (same entity owns wind & batteries) • Micro grid load balancing and energy stabilization

  6. Micro Grid demo: New Hope/eCo Park • 650 acres carbon neutral community; 24 -30 MW wind in phased development with 3-5 MW in first phase. • Micro grid managed by Scalable Energy Platform • Goal is to export electricity, load balancing, stability • Solve the local stability problem with storage instead of large inertial loads • Primary market a 5 minute, real-time double blind market • Potential to scale up and down, including some modification for “virtual” settings

  7. Business Strategy • Profit mechanisms can bring the lifecycle cost of a totally electric, fast charging v2g vehicle below the lifecycle cost of a comparable Internal Combustion Engine Vehicle • v2gNE is positioned to take advantage of regulation, wind balancing and micro grid stabilization • eCo Park provides facilities, supply chain and worker infrastructure for regional manufacturing model • Window of opportunity exists given the relatively long production cycle for most OEMs • Plan B (v2g is not yet profitable/feasible): vehicle energy management system and performance data of value in partnering with OEMs involved with smart charging PHEVs.

  8. Technological Readiness • Under the direction of Dr. Willett Kempton & the MAGICC consortium, an eBox has performed regulation with +/- 15 kW; it was the fastest responder on the PJM cue • The Ford E-F250 conversion will be more cost effective; conversions will be performed for v2gNE by an experienced in-house team of electric vehicle and racing vehicle mechanics and engineers

  9. Technological Readiness

  10. v2gNE Vehicle Status • eBoxes on order (working with AC Propulsion & Willett Kempton) • The Ford E-F250 conversion process under way

  11. v2gNE Participation Requirements • Electrical connection • No further studies required by ISO NE • Discussions underway with National Grid; initial sites identified. No issues predicted for interconnection study involving initial vehicles • Communications • Frame relay, router and RTU installed and operational • Pointlist for RTU entered into the ISO NE network model • Pointlist communication testing expected to occur at the end of August • NEPOOL Membership obtained in July 2009

  12. Opportunity Cost in MCP for Pilot? • Current Market Formula: • Standby + Mileage + Opportunity Cost • All three quantities are roughly the same order of magnitude. • Result of Incentive: Hydro stops providing power and starts regulating. Less alternative tech (heat, v2gNE, flywheels, batteries). More fossil fuel and nuclear generation. • Current Pilot Formula: • Standby + Mileage • Suggested Alteration to Pilot Formula: redefine the market clearing price byadding some “average” opportunity cost for standard power producers.

  13. Thank you for your time!