30 likes | 171 Views
SURFACE SYSTEMS. API SC6 Liaison report . Mike Briggs. RAISING PERFORMANCE. TOGETHER TM. Ballots processed since last meeting (6A voting group). Ballot 2693 - API 6AF2, 5th Edition – Addition of missing charts – passed (Document should be released by the end of February)
E N D
SURFACE SYSTEMS API SC6 Liaison report Mike Briggs RAISING PERFORMANCE. TOGETHERTM
Ballots processed since last meeting (6A voting group) • Ballot 2693 - API 6AF2, 5th Edition – Addition of missing charts – passed (Document should be released by the end of February) • Ballot 2696 - Spec 6A-Clarification of the requirements for overlay welding - Passed • Ballot 2713 – Spec 6A clarification and correction to material requirements • Ballot 2715 - 14H 6th Edition Passed (currently in comment resolution) • Ballot 6AV1; 2nd Edition Passed – should be published soon
Ballot 2663 - Propose US National Adoption of the ISO document, ISO 12490, Mechanical Integrity and Sizing Actuators and Mounting Kits for Pipeline Valves. Published as 6DX • Ballot 2678 - Spec 6D, Section 11.2 (Backseat testing) - Passed • Ballot 2692 - Withdrawal of API 6H, End Closures, Connectors and Swivels - Passed