1 / 12

Directions for EECS Computing and Networking

Directions for EECS Computing and Networking. David Culler U.C. Berkeley. Introducing. Hua-Pei Chen (Pei) - new Titan lead former LBNL chief technologist, unix group leader, … Rebuilding the group from top down Ken Lutz - Networked Systems Architect

clancy
Download Presentation

Directions for EECS Computing and Networking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Directions for EECS Computing and Networking David Culler U.C. Berkeley

  2. Introducing... • Hua-Pei Chen (Pei) - new Titan lead • former LBNL chief technologist, unix group leader, … • Rebuilding the group from top down • Ken Lutz - Networked Systems Architect • former Inktomi director of technical operations • 25% lead departmental technical position • 75% lead Millennium staff EECS C and N

  3. Project Research Groups Net Titan Administrative Computing Group Computer Services Group Instruction and Electronics Support Group And re-introducing, ... Pei Chen Jon Forrest Fred Archibald Jan Pardoe Katlin Voros Rob McNicholas Kevin Mullally Ferenc Kovac EECS C and N

  4. NEWS • SimMillennium NSF research infrastructure grant awarded! • 1.7 M$ for networking, UI/Viz, Computational Economy. • Campus Millennium staff support extended • MARCO center grant awarded • Campus Blue Ribbon Committees pushing for improved Comp. And Networking • 35 M$ Campus Network program • new earthquake proof backbone, risers, depts. • “Raise the floor” • Computer and support for every faculty • Instruction labs + PC requirement • Assoc. VC for Educational Technology • Campus switch to Exodus for ISP EECS C and N

  5. Basic research infrastructure • Rebuilding Titan core team to provide department-wide state-of-the-art research infrastructure • clearer relationship to CSG • Streamlining and sharing SWW on-going development • Completing transition to Pleiades clustered storage and information server • Cory starting similar development • Coherent NT infrastructure • Deep Unix/NT fusion • Elimination of clear-text passwords • Beyond the workstation/PC EECS C and N

  6. Networking • Cory network officially done (7/1/98) • 1.7 M$ (within 5%) • further enhancements expensed as upgrades • working with Bay to improve manageability of the core • ATM -> gigabit ethernet • Working on further switched 100BT enhancement to Soda • gigabit core already in place • via Titan • Major discount agreement in place with Bay (NorTel) • up to 5M$ at 30% • SimMillennium will build new gigabit experimental campus “tier” EECS C and N

  7. NS Arch Project Research Groups Net Titan Administrative Computing Group Computer Services Group Instruction and Electronics Support Group Towards Organizational Cooperation • Projects cross tech. Staff group boundaries. • Provide project-oriented technical guidance • translated strategic direction into tech. requirements and design • guide development • Clarify the interfaces • Focus missions • Enhance tech. expertise • Continuity across VCs EECS C and N

  8. PC Support • Current situation ‘filled the vacuum” • Titan NT-SWW => informal soda desktop support + “do it yourself” directions • IESG instructional labs and electronics => cory infrastructure + desktop support + intel donations • CSG HW support • Research groups did own thing • Working group will define common infrastructure • include NT/Unix integration, division of responsibilities, funding • CSG will offer a coherent, economical support contract with help desk • external tracking of progress and responsiveness • specific work assignment handled internally • IESG will drive forward state-of-the-art instructional and AV capabilities EECS C and N

  9. Beyond the desktop • Powerful infrastructure (0.5 TB coming up) • continue to grow • IBM has donated 150 PalmPilots to build new tier on Millennium via Ninja project • the research group members and relevant tech. Staff • CS 160 / 260 classes • interested first year grads • … then we’ll talk • Building PDA instructional lab • Building PDA connectivity infrastructure • initially ugly cradles all over • soon (hopefully) a clean wireless infrastructure • plan to grow project to entire EECS community EECS C and N

  10. AV situation • Seminar rooms have been upgraded with new PCs. • New high-tech seminar room in 405 Soda. • Simplifying fancy rooms by separating off high-tech from basic presentation needs. => Enhance project design and management capability EECS C and N

  11. Upcoming initiatives • Next Intel instructional request • interpret instructional broadly - read “lab” • focused on the upper division • apply strong guano filter • open for input • Working on a separate “new faculty” grant • utilize external research grants for onsey, twosey • Plan to put Sun / DEC thrust together • Expand wireless capability • ideas??? • CSE ??? • NCs ??? EECS C and N

  12. On-going CNR tasks • DHCP • Security • SSH, Kerberos, CA • IMAP, exchange • Calendar support • Authoring support • Division of labor with DCNS for host master, ip master, network maintenance • Department, COE, CSG need to upgrade databases • Modem bank EECS C and N

More Related