TEKNOLOGI TENAGA PERLIS CONSORTIUM SDN BHD. Selamat Datang STEAM TURBINE INTRODUCTION. 13 Oktober 2009. AGENDA. Pengenalan Diri Pengenalan Perlis Power Plant Concept / Background Main Design Group. Pengenalan. Abdul Malik Bin Abdul Rahman Operations Manager, Perlis Power Plant

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '13 Oktober 2009' - ciara


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
13 oktober 2009

TEKNOLOGI TENAGA PERLIS CONSORTIUM SDN BHD

Selamat Datang

STEAM TURBINE INTRODUCTION

13 Oktober 2009


Agenda
AGENDA

  • Pengenalan Diri

  • Pengenalan Perlis Power Plant

  • Concept / Background

  • Main Design Group


Pengenalan
Pengenalan

  • Abdul Malik Bin Abdul Rahman

  • Operations Manager, Perlis Power Plant

  • Background: BSc Chemical Engineering

  • Experience: Fatty Acids Production(Palm Oil), Engineering Plastics(Monomer), Power Generation


Perlis power plant
Perlis Power Plant

  • 650 MW Combined Cycle Gas Turbine (CCPP)

  • 3 x ALSTOM GT13E2

  • 1 x ALSTOM ST

  • 3 x ALSTOM HRSGs

  • Contributes 4% of the total electricity generation of the Malaysian peninsular


Perlis ccpp
Perlis CCPP

  • Power Block

  • 650 MW Site Rated Combined Cycle Power Plant (CCPP)

  • Three Dual Fired Alstom 143MW GT13E2 and Three Dual Pressure HRSGs

  • One 221MW Steam Turbine

  • Step Up Transformers ( 4 units; 2x132kV and 2x275kv)

  • Balance of Plant (BOP)

  • Demineralized Water Treatment Plant (2 x 100%)

  • Gas Dew Point Heaters (2 x 50%)

  • Emergency Diesel and Black Start Diesel generators

  • Cooling Towers

  • 2 x 13,500 m3 Oil Tanks and 3 Water Storage Tanks


Basic combined cycle gas turbine power plant ccgt provide efficiencies up to 60
Basic Combined Cycle Gas Turbine Power Plant (CCGT) Provide Efficiencies up to 60%

Cooling

Water

Gas or Oil

Supply

Air

Supply

Steam

Turbine

Generator

Steam

Electrical

Output

Electrical

Output

Heat Recovery

Steam Generator

(HRSG)

Condensate

Condenser

Generator

Gas

Turbine




History
History

  • 1st Century - Hero of Alexandria in Roman Egypt

  • 1551 - Taqi al-Din in Ottoman Egypt, who described it as a prime mover for rotating a spit

  • 1648 - by John Wilkins

  • 1660 – by Samuel Pepys

  • 1629 - Italian Giovanni Branca

  • 1884 - The modern steam turbine was invented in 1884 by the Englishman Sir Charles Parsons, whose first model was connected to a dynamo that generated 7.5 kW of electricity




Steam turbine types
Steam Turbine Types

1- Straight Condensing turbines which allow steam to expand to the lowest possible pressure before it is condensed into water.

2- Back-pressure and topping turbines in which steam is exhausted before it is fully expanded. Generally, provide low pressure steam for heating or process.

3- Extraction turbine in which steam is extracted (controlled or uncontrolled) during the expansion process for use in othe application such as district heating.