1 / 7

TIPHON LI implications

TIPHON LI implications. Scott Cadzow. Architecture. TIPHON work. Actions from TC SEC LI Evaluate the need for a session protocol Define transition from ROSE to either FPT with IP stack, or ROSE with IP stack. Internal actions Define TIPHON specific data in ASN.1

chynna
Download Presentation

TIPHON LI implications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIPHONLI implications Scott Cadzow

  2. Architecture

  3. TIPHON work • Actions from TC SEC LI • Evaluate the need for a session protocol • Define transition from ROSE to either FPT with IP stack, or ROSE with IP stack. • Internal actions • Define TIPHON specific data in ASN.1 • Define abstract interception flows to MF

  4. LI Requirement • On TIPHON • No local storage of Intercept records (HI2) and traffic (HI3) • Real time delivery of Intercept records and traffic • On LEA • Always on intercept record and traffic acceptance

  5. Further requirements • Standardisation • Existing standards available in existing products • Security • Protection from DNS attack on public interface • Trusted staff in the TIPHON operator environment • Target shall not be identifiable by other (traffic) analysis

  6. FTP versus ROSE • FTP is in favour with LEAs • Favour is accorded by economics • Simple (quick) to implement • ROSE supported by application builders • An application of a Remote Procedure Call (RPC) • Abstract specification • Requires application to make sense of the data

  7. LI in TIPHON • Known target standard = ES 201 671 • Abstract data already described • GSM, TETRA and ES 201 671 in ASN.1 • Target discovery to be described • Identify signalling mapping to record type • BEGIN, END, CONTINUE

More Related