WIRELESS TECHNOLOGIES AND APPLICATIONS CS-422 – EE436. Child Tracking System. Deniz Akkaya Onur Külçe Önal Zengin Duru Can Celasun. Outline. Project Definition Work Done by Participants Basics of CTS Project Details Teacher Children Progress Chart Future Work

1 / 24

Download Presentation

Child Tracking System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WIRELESS TECHNOLOGIES AND APPLICATIONS CS-422 – EE436 Child Tracking System Deniz Akkaya Onur Külçe Önal Zengin • Duru Can Celasun

  2. Outline • Project Definition • Work Done by Participants • Basics of CTS • Project Details • Teacher • Children • Progress Chart • Future Work • Developmental Stage of the Prototype

  3. Project Definition • Child Tracking System is basically a network system established using Bluetooth Technology.

  4. Where Can You Use • Children • Tourists • Museums • School Excursions

  5. Broadcaste Range • Short Range Working – Range Limitter • Hop Counter • ID – Recognition • Personal Alerts • Messaging System

  6. Work Done By Participants Onur Külçe • Önal Zengin • Duru Can Celasun • Deniz Akkaya

  7. Basics of CTS • Java Mobile Platform • Wireless Toolkit • J2ME • Netbeans • Scatter Network (Master-Slave Structure) • Bluetooth Devices

  8. Project Details ScatterNet

  9. Project Details • Bluetooth Wireless protocol for exchanging data over short distances over fixed and mobile devices. Uses frequency hopping spread spectrum. Chops up data and transmits chunks using up to 79 frequencies.

  10. Project Details • Set of inter-connected piconets. • Piconet is a ad-hoc network of “in-range” devices. • Scatternet enables more flexibility, higher capacity and larger networks. • Scatternet requires nodes to be present in multiple piconets.

  11. Project Details

  12. Project Details

  13. Project Details

  14. Project Details

  15. Project Details New Device

  16. Project Details New Device

  17. Project Details Connection Lost

  18. Project Details • Text messaging and conferencing. • Short range voice chat. • Video Streaming. • Application sharing. Et cetera.

  19. Project Details • Bluetooth 2.2 / 3 released by may 2009. • Nicknamed “Super-Bluetooth”, it has the capability of much higher transmission rates (upto 30 Mbps).

  20. Progress Chart • Gathering Information • Bluetooth 1.0 Book, Bluetooth Revealed, Bluetooth Programming • Meetings with course instructors. • UML Diagram and Software Discussions • Java Mobile Libraries • On PC Simulations • PC – Bluetooth • Mobile Device – Mobile Device

  21. Progress Chart • Gathering Information - DONE • Bluetooth 1.0 Book, Bluetooth Revealed, Bluetooth Programming • Meetings with course instructors. • UML Diagram and Software Discussions - DONE • Java Mobile Libraries • On PC Simulations - DONE • PC – Bluetooth - DONE • Mobile Device – Mobile Device - DONE

  22. Progress Chart As A Future Work • Alerts • Special Functions • User Friendly Interface • Data Storage and Report

  23. Progress Chart As A Future Work • Alerts • Special Functions • User Friendly Interface • Data Storage and Report

  24. Let’s see where we are... Thank you for listening