1 / 11

Introduction to Live Demonstration

Introduction to Live Demonstration. Roger Li, D-AIM Project Manager LFV D-AIM Final Demonstration and Workshop Stockholm-Arlanda Airport June 5, 2009. Live demo scope. Pilot. AOC. Data Integrator. Airport Operator. ATC. Scope of demo. Live Demo Flight. Aircraft: BEECH B200

chuong
Download Presentation

Introduction to Live Demonstration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to Live Demonstration Roger Li, D-AIM Project Manager LFV D-AIM Final Demonstration and Workshop Stockholm-Arlanda Airport June 5, 2009

  2. Live demo scope Pilot AOC Data Integrator Airport Operator ATC Scope of demo Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  3. Live Demo Flight Aircraft: • BEECH B200 • Equipped with NavAero Electronic Flight Bag (EFB) and VDL mode 4 Data Link transceiver Flight: • Take off from Stockolm-Bromma, landing at Stockholm-Arlanda • Flying in Stockholm Terminal Area (Stockholm TMA) • Approximate duration of flight: 20 minutes Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  4. Different User Systems – Same Information Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  5. Live demo flight on display Small screen: Pilot view Laptop running EFB software and connected to VDL Mode 4 data link transceiver. Big screen: Ground user view and Message Origination PC running AirTraq software, web applications in Internet Explorer, etc. PC also connected to D-AIM server database (replacing the real originator during demo) Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  6. Scenario – Take off • Taxiing at Stockholm-Bromma • TWY Closure NOTAM • Take off Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  7. Scenario – En-Route • Flying north • TSA activation • Approach Arlanda • METAR and SIGMET (SIGMET) Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  8. Scenario – Approach and Landing • Approaching Stockholm-Arlanda • RWY Closure NOTAM • Landing and Taxiing Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  9. Outstanding issues in current version of system Overall system: • Time stamping of TSA messages EFB software: • HMI • Flight Plan functionality Web services (WMS/WFS): • HMI • Enhanced filtering (time) Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  10. Live demo flight in an operational environment • Demo flight being conducted alongside with day-to-day operations • Sudden changes due to ATC possible • Beware of the “demo ghost”! Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

  11. Time for take off! Roger Li, D-AIM Demo and Workshop, Norrköping Airport, 27th November 2008

More Related