Analysis of NGMN Requirements
Download
1 / 5

Specifications - PowerPoint PPT Presentation


  • 122 Views
  • Uploaded on

Analysis of NGMN Requirements REQ 6: Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality. Specifications. Related 3GPP SA5 specifications TS 32.421/32.422/32.423/32.425 Subscriber and equipment trace TS 32.441/32.442/32.443/32.445 Trace Management IRP

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Specifications' - christmas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Specifications

Analysis of NGMN RequirementsREQ 6: Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality


Specifications
Specifications

Related 3GPP SA5 specifications

  • TS 32.421/32.422/32.423/32.425 Subscriber and equipment trace

  • TS 32.441/32.442/32.443/32.445 Trace Management IRP

  • TS 32.xyz MDT OAM (new Rel-10 MDT WI)

  • TR 32.827 Study on Integration of device management information with Itf-N

    Current Status of the specifications

  • Trace related specifications (TS 32.42x and TS 32.44x) completed and stable since Rel-8.

  • Study of minimization of drive tests has been completed in Rel-9. TR 32.827 has been concluded and corresponding new Rel-10 WI has been approved in SA5.


Trace in existing 3gpp standards
Trace in existing 3GPP standards

Enhancement to include UE for MDT purpose has been proposed in TR 32.827

IRPManager

Management based trace

Trace Management

Signalling based trace

Enhancement to include UE for MDT purpose is under discussion.

IRPAgent

  • Operator is able to configure the management based trace .

  • Operator is able to configure the signaling based trace within one technology.

  • Enhancement for MDT support has been discussed under Rel-9 TR 32.827 and will be further discussed under Rel-10 UE measurement management WI.


Substitution of monitoring probes by infrastructure inherent trace functionality
Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality


Substitution of monitoring probes by infrastructure inherent trace functionality1
Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality