WP 7 Helpdesk Facility and Extending the Network. Patricia Mergen , Boris Jacob Royal Museum for Central Africa (MRAC). Results achieved 7.1. 7.1 Helpdesk Facility: D10 / C7.1.3 Dispatching system to answer questions timely operational ( MNHN ). Results achieved 7.2.

chin
Download Presentation

WP 7 Helpdesk Facility and Extending the Network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 7Helpdesk FacilityandExtendingthe Network Patricia Mergen, Boris Jacob Royal Museum for Central Africa (MRAC)

  2. Resultsachieved 7.1 • 7.1 Helpdesk Facility: D10/ C7.1.3 Dispatching system to answer questions timely operational (MNHN)

  3. Resultsachieved 7.2 • C7.2.2 Analysis of documentation, gaps and plan for needed additional documentation. (UT-NHM) • Analysis of importance and attribution to user groups. • D11 / C7.2.3 Enriched + checked existing documentation in orig. language (website) (MRAC) • Documentation browser on the Helpdesk + linking to specific documents for new providers and

  4. Resultsachieved 7.3 • C7.3.1 List of criteria and benefits to become Open Up! associated partners established (UH) • Re-used for the outreach activities with WP8. • C7.3.2 First OpenUp! tutorial and training session for new providers of the consortium (RBINS) • Used as basis for the Tutorial 2 yesterday. • C7.3.3 Preliminary list of potential associated partners identified (UH) • List of 300+ institutions as a basis for the Outreach campaign in year 3. • Shortlist of ~30 institutions already contacted. • D19 / C7.3.4 Standard procedure for associated partners operational (UH) • Fixed workflow between WP1, WP3, WP4, WP5, and WP7

  5. Performance indicators(DoW, p. 70) * The 4 are: The Tallinn University of Technology, Institute of Geology; The Electronic World Catalog of Symphyta; Naturkundemuseum Chemnitz; Natural Europe (as an alternative route to Europeana). 8 in pipeline of whom some might provide via BioCASe of others: Swedish Museum of Natural History; Natural History Museum, Norway; Museum of Zoology of Strasbourg; Musée de la Vallée; Museum George Sand et de la Vallee Noire; Museum fürNaturkunde und Vorgeschichte Dessau; PaläontologischeSammlung der FreienUniversität Berlin; Geologisch-PaläontologischeSammlungUniversität Leipzig

  6. Difficultiesencounteredandremedialactions

  7. Workplanforyear3 – Project objectives 7.1 Helpdesk Facility: • Updates are done on the Helpdesk technology in synergy with other projects (SYNTHESYS, EU BON). • Updates on content is done in relation to task 7.2 and WP8 Outreach and dissemination 7.2 Documentation I: • Coordinate the production of new documentation of the services set up by OpenUp! for users and providers. Coordinate needed translation of documentation in national languages. [UT-NHM with all]

  8. Workplanforyear3 – Project objectives 7.2 Documentation II: • Check, proof read, update, enrich existing documentation as needed is ongoing process. • Coordination of production new documentation and translation is main task in year 3 7.3 Extending the Network: • Develop an Outreach strategy to attract associated partners (in close collaboration with WP8 on Dissemination and awareness) • Outreach campaign started as test, enhancement and execution with WP8 and all interested partners is major task in year 3

  9. Workplanforyear 3 – Reports