2004 Warm Springs Reservation Road Maintenance Report Overview

DESCRIPTION

This report details the budget allocation by activity for the Warm Springs Reservation Road Maintenance Department in 2004. Key activities include snow and ice removal (71%), blading (16%), and minor equipment repair (7%). A breakdown of leave and holiday percentages is provided, indicating a total of 19% earned through various leave types. The report emphasizes the value of road maintenance employees and the importance of allowing them time off to prevent overwork. Additional activities include guardrail maintenance and brush removal, which are crucial for the overall upkeep of roads.

1 / 6

Download Presentation

2004 Warm Springs Reservation Road Maintenance Report Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Road Maintenance Report2004

  2. Warm Springs Reservation

  3. Road Maintenance DepartmentPercent of budget by activity code Activity Description Percent 71 Snow and Ice Removal 16.01 11 Blading 15.63 90 Leave and Holidays 14.50 53 Striping 11.99 82 Minor Equipment Repair 7.38 40 Road Patrol 5.23 97 Travel 5.20 95 Program Management 4.90 81 Equipment Service 3.58 18 Surface Cleaning 3.28 62 Cattleguard Repair 2.92 70 Winter Prep 2.49 10 Surface Inspection 2.24 51 Sign Repair 2.15 43 Brush Removal 1.99 13 Patching 1.91 91 Training 1.78 All Others 30 Activities Total 12.26

  4. Leave and Holiday Breakdown Annual Leave 8 hrs/pay period = 10% Sick Leave 4 hrs/pay period = 5% Holidays 10/year (80hrs/2080hrs) = 4% approx Total Percentage Earned = 19% Words of wisdom from first supervisor: These are valuable employees who are needed in almost all crisis situations. They complete many different tasks in any given year. If you respect them you should allow them to have some time away from job during the year. Don’t over work them. Plan their vacation time.

  5. Additional Power Point Presentations • Winter Storm 2004 (Snow and Ice Removal) • Magnesium Chloride Application (Blading) • Paint Striping (Hand and Pick-up truck towed) • Retrometer Study

  6. 30 Other Minor Activities Include the following (over $5,000+/year); Guardrail Maintenance Cleaning Ditches Cleaning Structures Mowing Delineator Maintenance Sidewalks Bridge Deck Repair