An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BPMs and ToroidsFacility Advisory CommitteeApril 16, 2007 • System overview • Status • Schedule

  2. Charge Monitoring • Should be commissioning 6 toroids, 2 Faraday cups • Injector charge monitor electronics installed • Only 3 of 6 toroids installed • IMS, IMBC1in commissioning • IM01 installed but • Output shorted by vacuum bolt • Replace when we can break vacuum • IM02, IM03, IMBC1out not installed • Two Faraday cups installed • FCG1 functional • FC01disabled on insertion

  3. S2 S1 Baseline Int#1 Channel Access 4 Chan Fast Digitizer + - LNA S/H S4 Toroids 1-4 S3 Beam Pulse Int#2 S5 LMR-400 x 8 Raw Data MPS Signals to Fast Acquisition Board for waveform capture Toroids 5-8 Toroid/Cal Cables Beam Pulse Analog Charge Values trig Int#1 Int#2 Signal amplitude IOC MPS EVR ADC Dark Current Channel Access t1 t5 t6 Acromag IP330 16 channel, 16-bit 8uS conv. time t3 t4 t2 EVR Charge Monitors

  4. Toroid Dark Current Monitor

  5. Toroid Interior

  6. Results • Two toroids measure charge • Readings appear to jitter +-5% • more than we think the beam current jitters • Amp input bandwidth too high • Decrease bandwidth into first amp • Present bandwidth not useful • May be causing several percent jitter • Expect this will be resolved quickly • Early indication is that an impromptu RC filter reduces jitter • Will engineer proper mod to input network

  7. Next Phase • Complete Injector installation/commissioning • 7 more toroids : • BC2 • LTU • Undulator • Dump • BC2 / BTH west installation design in progress

  8. Beam Position Monitors • System overview • Status • Schedule

  9. Status • Built 23 BPM processors • Installed 21 BPM processors • Problems remaining • Parts for remaining two • Commissioning software • No global setup tool

  10. BPM Diagnostic Panel • View/ adjust BPM parameters • View digitizer waveform • Set attenuators • Set timing • Watch beam position pulse to pulse

  11. Orbit Plot

  12. Gun Jitter • Beam jitter plus BPM resolution ~10 microns

  13. Status (cont.) • Performance at least adequate for commissioning • Preformance not yet well studied • Just getting access to tools • Correlation plots, beam synch acquisition

  14. Next • Characterize BPM performance • Establish resolution, offset, stability in operation • Plan for BC2, linac BPM installation • 8 BPMs per sector • New environmetally-controlled racks • Revise BPM processor board • Fab, test, install linac BPM system this year