1 / 13

Software Support for ESB Activities

Software Support for ESB Activities. Test Facilities Department and Interested Parties: E163 (AARD), LC, Accel. Tech. Research. Bottom Line. We use all the controls hardware/software that we have (almost all the “things” that MCC uses, but with fewer of each)

chapa
Download Presentation

Software Support for ESB Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software Support for ESB Activities Test Facilities Department and Interested Parties:E163 (AARD), LC, Accel. Tech. Research

  2. Bottom Line • We use all the controls hardware/software that we have (almost all the “things” that MCC uses, but with fewer of each) • We plan to continue to do so for the foreseeable future • We plan to expand with 2 new L-Band RF test stands and getting the 2-Pack program going

  3. What We Do ESB Experimental Hall Future L-Band Test Stands 2-Pack L-Band Accelerator Housing Beamline NLCTA 3 X-Band RF stations Gun RF

  4. What We Do • X-Band RF structure processing • 2 RF stations can process 4 structures. • Have a strong interest from CLIC/CERN with a very long list of how they’d like to utilize the resources here • L-Band RF component and structure processing • 1 RF station whose output is used to process and study RF distribution components and a structure in the tunnel

  5. What We Do (cont) • Beam running for Advanced Acceleration Studies • E163: Has achieved microbunching (attosecond) and will use this beam with photonic band structures to accelerate the beam. • They run about 50% of the time (3 weeks on, 3 weeks off) • Beam running for structure evaluation • Happens ~1 week of 12.

  6. What We Plan to Do • Plans to continue all existing programs for the foreseeable future • 2 new L-Band RF Test Stands with new modulator • First one coming in the next 6-12 months • With plans to run indefinitely • Use 2-pack for high power component tests and to power structures in NLCTA

  7. Controls Hardware • 3 micros: TA01, TA02, TA03 • With 10+11+7=28 crates • 6 hard IOCs: TR00, TR01, TR07, TR08, TR09, TR10 • With 2 more coming for L-Band test stand • 2 soft IOCs: TS00 (L-Band modulator) and TS01 (local GPIB things) • 3 Gateway machines: gtw04 & gtw05 AND hard IOCs are still boot from gtw00

  8. Current EPICS Use • Required for RF processing, GPIB interface, and PLC go-between for X-Band and L-Band stations • Used exclusively for control and readout of L-Band station • We use the usual tool set: • Archiver & Viewer, DM/DM2K/EDM, cmlog, save/restore, channel watcher, strip tool, access to SCP DB values, CA through matlab, labview, etc.

  9. Current SCP Use - Magnets • The usual set of hardware & software to run an accelerator: • Magnets: LGPS, SOLN, QUAD, XCOR, YCOR, AMPL, STEP, XMOV • Control: on/off, trim, calibrate, standardize • Diagnostics: knobs, HSTA statuses • Read back: historied • Knobbing! • Multiknobs, direct magnet control, triggers

  10. Current SCP Use – Timing, BPMs • TIMING • TRIGs, TRBRs, BPMs • We only use one beam code and 5-10 modifier bits & rate states: 0 Hz, 1 Hz, 10 Hz for beam. • Do use a second BGRP to test BCS daily • Rely on 476 MHz + fiducials coming in. • ~40 BPMs • Self-triggering for fine timing, rely on backplane trigger for coarse • Multiplexed, FFTB/SLC FF style • GADCs • Read out through BPM system interface • ~10 are HSTBd: BPMSAMPL

  11. Current SCP Use – Protection Systems, ADC/DAC, & DIO • PPS, MPS, & BCS • Hardware systems with extensive DIO (IDIM & IDOM) • We don’t use the “new MPS” system • Do daily check of BCS with a 12 Hz BGRP • Analog readout & HSTB • Hundreds of ASTSs: RF signals, power supply readout, temperatures, vacuum, etc. • Use a few DSP displays – show multiple VACP, etc. • DIO – Extensive Use • Vacuum, BSOIC resets, Profile Monitors, etc.

  12. Current SCP Use – Software Applications • Feedbacks • NLCTA uses fast feedbacks for long term RF stabilization (have an EPICS work around) • Both NLCTA & E163 rely on slow feedbacks: • Implement epics calculated multiknob changes • Feedback to watch RF amplitude & phase and change AMPL • Correlation Plots • Configurations (heavily used) – magnets, timing, BPMs

  13. Current SCP Use – Software Applications • Modeling & Orbit Feedbacks • Don’t use now, but would like to in the future • SIPMAIN • Don’t use CUD but do rely on it for ERRLOG/ERRDSP • Camcom occasionally – essential when needed • Few button macros & access jobs • Rely heavily on ELOG & ARTEMIS

More Related