60 likes | 77 Views
Get high achievement rate in CQT Certification Exam with our exam PDF questions answers engineered by the supported people of Information Technology industry. For more data please visit here: https://www.certswarrior.com/exam/CQT/
E N D
ASQ CQT ASQ Certified Quality Technician Questions & Answers PDF For More Information: https://www.certswarrior.com/ Features: 90 Days Free Updates 30 Days Money Back Guarantee Instant Download Once Purchased 24/7 Online Chat Support Its Latest Version Visit us athttps://www.certswarrior.com/exam/cqt/
Latest Version: 6.0 Question: 1 Which of the following is the best definition of a flow chart? Response: A.A diagram used to structure ideas into useful categories B.A picture used to separate steps of a process in sequential order C.An illustration used to analyze variation in a process D.An analytical tool used to clarify opposing aspects of a desired change Answer: B Question: 2 Which of the following tools would be best for measuring projected surface intersections? Response: A.Optical comparator B.Protractor C.Thread micrometer D.Profilometer Answer: A Question: 3 A material review board (MRB) usually has the responsibility for which of the following? Response: A.Defining the statistical specifications of nonconforming material B.Controlling the cost of materials C.Analyzing and dispositioning of nonconforming material D.Assuring the availability of materials to meet production schedules Answer: C Question: 4 Visit us athttps://www.certswarrior.com/exam/cqt/
Which of the following elements of an audit program must be aligned with the organization’s overall strategy? Response: A.Compliance B.Scope C.Schedule D.Objectives Answer: D Question: 5 Which of the following tools can only be used to collect attributes data? Response: A.Ring gage B.Micrometer C.Steel scale D.Dial indicator Answer: A Question: 6 Who is responsible for determining whether a follow-up response is sufficient to close out an internal audit? Response: A.The quality manager B.The internal auditee C.The audit team leader D.Executive management Answer: C Question: 7 Which of the following groups is responsible for producing parts to specifications? Response: Visit us athttps://www.certswarrior.com/exam/cqt/
A.The manufacturing engineering department B.The quality assurance department C.The manufacturing department D.The process engineering department Answer: C Question: 8 What is the recommended minimum number of subgroups necessary to calculate the limits for a control chart? Response: A.25 B.15 C.35 D.10 Answer: A Question: 9 Under which of the following circumstances can the calibration interval of a gage be lengthened? Response: A.No defective parts were produced that were checked with the gage. B.The production rate of the parts checked with the gage increases. C.History indicates satisfactory calibration performance. D.The inspection department requests the change in writing. Answer: C Question: 10 The reduction or elimination of incoming inspection stations should be considered only when Response: A.it is cost-prohibitive to the supplier to test the parts B.evidence of supplier process control techniques is provided for the material used C.the next process step will mask defects D.evidence of a high defect rate is present in the manufacturing operation Visit us athttps://www.certswarrior.com/exam/cqt/
Answer: B Visit us athttps://www.certswarrior.com/exam/cqt/
http://www.certswarrior.com/ Questions and Answers (PDF) For More Information – Visit link below: http://www.certswarrior.com Disc ount Coupon Code: CERT SWARRIOR10 Page | 1 http://www.certswarrior.com/exam/M2180-651/ Visit us athttps://www.certswarrior.com/exam/cqt/ Powered by TCPDF (www.tcpdf.org)