Time is running out to say  No  to Coleford Wind Turbine.  Will the field by you be next Preloader

Time is running out to say No to Coleford Wind Turbine. Will the field by you be next - PowerPoint PPT Presentation


  • 188 Views
  • Uploaded on

Wind turbines don\'t work all of the timeOn average a wind turbine works around 25% of the time. Centrica have suggested that some are intermittent and require back up generation\'. And there have been reports that some generate extremely low levels of energy. See Google for more details.Colefor

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Time is running out to say No to Coleford Wind Turbine. Will the field by you be next' - casimir


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript